Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

145 Leslie St

The City of Toronto has 3 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal to underpin basement.

    Applied Feb 11, 2016 · issued Feb 26, 2016 · completed Mar 28, 2022 · Permit 16 115929 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal to underpin party wall 143 Leslie St, reconstruct front and rear foundation walls, construct rear basement walkout and finish existing basement.

    Applied Feb 11, 2016 · issued Feb 26, 2016 · completed Apr 16, 2022 · Permit 16 115929 BLD

    Closed
  • Drains and site services

    Drain - Proposal to underpin basement.

    Applied Feb 11, 2016 · issued Feb 26, 2016 · completed Mar 28, 2022 · Permit 16 115929 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 19 Alton Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front covered porch extension, and a rear two-storey addition with a deck and stairs.

    220 m away · filed Nov 25, 2025 · Approved

  • 45 Jones Ave · Minor variance

    To legalize and maintain the existing rear two-storey addition, including a basement extension below with a walkout, a rear second floor balcony (above the garage), and side (north) exterior staircases (one leading to the ground level and one leading to the second level), which was constructed without an authorized building permit.This addition will be abutting the existing one-storey detached ancillary building (garage), will not be accessible through the main portion of the dwelling and will have separate accesses to each level. There will be one residential dwelling unit on this lot.

    240 m away · filed Jul 22, 2025 · Refused

  • 203 Leslie St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition, a third storey addition, and a new front porch. Also, to maintain the existing rear yard parking spaces (two spaces).

    180 m away · filed Nov 12, 2024 · Approved

  • 23 Curzon St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a ground floor deck and stairs.

    130 m away · filed Oct 16, 2024 · Approved

  • 43 Hastings Ave · Minor variance

    To legalize and to maintain the front porch, which was constructed without an authorized building permit.

    100 m away · filed Oct 8, 2024 · Approved

  • 59 Jones Ave · Minor variance

    To legalize and to maintain the front integral garage which was constructed beyond the limits of the approved building permit. Also, to alter the new three-storey semi-detached dwelling, which is currently under construction, by permitting a rear third storey addition.

    230 m away · filed Dec 18, 2023 · Approved

  • 59 Jones Ave · Minor variance

    To legalize and to maintain the front integral garage which was constructed beyond the limits of the approved building permit. Also, to alter the new three-storey semi-detached dwelling, which is currently under construction, by permitting a rear third storey addition.

    230 m away · filed Dec 14, 2023 · Approved

  • 29 Curzon St · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear second floor roof deck, and a ground level rear deck and terrace. Also, to reconstruct the enclosed front porch.

    130 m away · filed Mar 3, 2023 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.