Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

145 Queen St E

Fred Victor Centre

The City of Toronto has 7 building permits since 2017 (5 still open) and 2 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal for a 1 storey addition to an existing catering kitchen, interior alterations to the main floor and basement for new storage rooms in existing community centre - "Fred Victor Centre"See also 18 154507 ZPR, 18 247898 MV and Final and Binding A1068/18TEY.

    Applied Sep 15, 2020 · issued Oct 13, 2020 · completed Dec 31, 2025 · Permit 20 121314 PLB

    Closed
  • Heating and ventilation

    HVAC - Revision 1 new changes to the heating system. Proposal for a 1 storey addition to an existing catering kitchen, interior alterations to the main floor and basement for new storage rooms in existing community centre - "Fred Victor Centre"See also 18 154507 ZPR, 18 247898 MV and Final and Binding A1068/18TEY.

    Applied Sep 15, 2020 · issued Oct 12, 2020 · Permit 20 121314 HVA (revision 01)

    Revision issued
  • Addition or alteration · Multiple projects

    Revision 01 - Minor revisions to the basement layout only. Proposal for a 1 storey addition to an existing catering kitchen, interior alterations to the main floor and basement for new storage rooms in existing community centre - "Fred Victor Centre"See also 18 154507 ZPR, 18 247898 MV and Final and Binding A1068/18TEY.

    Applied Jul 27, 2020 · issued Aug 11, 2020 · Permit 20 121314 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Proposal for a 1 storey addition to an existing catering kitchen, interior alterations to the main floor and basement for new storage rooms in existing community centre - "Fred Victor Centre"See also 18 154507 ZPR, 18 247898 MV and Final and Binding A1068/18TEY.

    Applied Mar 3, 2020 · issued Jul 7, 2020 · Permit 20 121314 HVA

    Inspections under way
  • Addition or alteration · Multiple projects

    Proposal for a 1 storey addition to an existing catering kitchen, interior alterations to the main floor and basement for new storage rooms in existing community centre - "Fred Victor Centre"See also 18 154507 ZPR, 18 247898 MV and Final and Binding A1068/18TEY.

    Applied Mar 3, 2020 · issued Jun 24, 2020 · Permit 20 121314 BLD

    Inspections under way
  • Heating and ventilation · Other

    Proposal to add new auxiliary split A/C units, replace non-functioning make-up air unit, replace roof top fan unit and upgrade the cooking exhaust hood

    Applied Oct 31, 2018 · issued Nov 30, 2018 · Permit 18 250436 MSA

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to repair fire rated wall assemblies due to water damage. Existing use - drop in community services, "Fred Victor Centre"

    Applied May 17, 2017 · issued Jun 2, 2017 · completed Jan 6, 2018 · Permit 17 161860 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To alter the existing mixed-use building by enclosing a portion of the loading dock to expand the kitchen preparation area associated with the community centre and convert a portion of the underground parking into storage and telecommunications closets.

    Decision: Approved (hearing Jan 22, 2020)

    Filed Nov 19, 2019 · File A1180/19TEY

    Closed
  • Minor variance · Other

    To alter the existing mixed-use building by enclosing a portion of the loading dock to expand the kitchen preparation area associated with the community centre and convert a portion of the underground parking into storage and telecommunications closets.

    Decision: Approved (hearing Feb 27, 2019)

    Filed Oct 25, 2018 · File A1068/18TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 125 George St · Consent

    To obtain consent to create a new stratified easement/right-of-way.

    170 m away · filed Jun 2, 2026 · Hearing scheduled

  • 134 Jarvis St · Minor variance

    To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.

    100 m away · filed Sep 4, 2025 · Approved

  • 53 Mutual St · Minor variance

    To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.

    250 m away · filed Jul 23, 2025 · Approved

  • 89 Church St · Minor variance

    To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.

    230 m away · filed Nov 4, 2024 · Approved

  • 203 Jarvis St · Consent

    To obtain consent to a strata severance and to create various easements/rights-of-way.

    240 m away · filed Sep 17, 2024 · Approved

  • 90 Queen St E · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-laws 218-2021 and 219-2021), for a new 34-storey mixed-use building (which is currently under construction), by reducing the minimum number of vehicular parking spaces. There will be a total of 369 residential dwelling units on this lot.

    100 m away · filed Aug 19, 2024 · Approved

  • 167 Queen St E · Minor variance

    To alter the existing three-storey mixed-use building by converting the second and third storey from a Residential use (a total of 5 dwelling units) into a Hotel use (a total of 10 rooms). Also, to construct a Personal Service Shop use within the basement. In addition, to convert the existing rear third storey terrace into an exterior amenity space by constructing a new canopy.

    100 m away · filed Mar 13, 2024 · Approved

  • 88 Queen St E · Consent

    To obtain consent to a strata severance and to create various easements/rights-of-ways within a 52-storey mixed-use redevelopment currently under construction.

    150 m away · filed Jan 26, 2024 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.