Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

145 Winona Dr

The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal to replace existing second floor washroom with new and construct two (2) new closets on second floor of existing semi-detached - single family dwelling.

    Applied Feb 12, 2015 · issued Feb 13, 2015 · Permit 15 114990 PLB

    Inspections under way
  • Small residential project · Interior alterations

    Proposal to replace existing second floor washroom with new and construct two (2) new closets on second floor of existing semi-detached - single family dwelling.

    Applied Feb 12, 2015 · issued Feb 13, 2015 · Permit 15 114990 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 1 Burlington Cres · Consent

    To obtain consent to sever the property into two residential lots.

    190 m away · filed Jul 23, 2026 · Accepted

  • 97 Alberta Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing an enclosed front porch with stairs (to contain a mudroom).

    140 m away · filed Jun 19, 2026 · Approved

  • 246 Benson Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a side (east) two-storey addition with a ground floor deck and stairs and a side (east) second storey juliet balcony.

    40 m away · filed Jul 25, 2025 · Approved

  • 81 Greensides Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing rear additions to the first and second storeys, a complete third storey addition, a front covered porch with a canopy and platform, a rear covered porch, and a rear third storey balcony. Also, to construct a new one-storey detached ancillary building (two-car garage), in the rear yard, abutting the private laneway.

    200 m away · filed Jul 22, 2025 · Approved

  • 908 St Clair Ave W · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 1103-2009), for a new 12-storey mixed-use building (currently under construction), by reducing the minimum number of residential and visitor parking spaces. There will be a total of 173 residential dwelling units on this lot. The north portion of the site is subject to By-law 569-2013, and the south portion of the site is subject to By-law 1103-2009.

    230 m away · filed Sep 13, 2024 · Approved

  • 5 Burlington Cres · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing partial rear additions on the first and second storeys, as well as a new rear ground floor deck with stairs. The existing ancillary building (detached garage), in the rear yard, will be maintained and unaltered.

    220 m away · filed Mar 18, 2024 · Approved

  • 139 Benson Ave · Minor variance

    To alter the existing detached two-storey dwelling by constructing a side (west) one-storey addition.

    230 m away · filed Dec 22, 2023 · Approved

  • 40 Hendrick Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a two-storey rear addition, a ground floor rear addition, and a third floor side dormer addition. Also, to reconstruct the existing front porch and stairs.

    70 m away · filed Apr 11, 2023 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.