Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 6, York Centre

147 Bombay Ave

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Interior alterations

    Rev 02- Interior alterations to the main floor including adding a new exterior door.Proposal for interior alteration at main floor and second floor.

    Applied Feb 9, 2026 · issued Feb 19, 2026 · completed Jun 24, 2026 · Permit 25 260858 BLD (revision 02)

    Closed
  • Small residential project · Interior alterations

    Rev 01 - Interior alterations to the main floor including adding a new exterior door.Proposal for interior alteration at main floor and second floor.

    Applied Feb 2, 2026 · completed Feb 5, 2026 · Permit 25 260858 BLD (revision 01)

    Cancelled
  • Plumbing

    Plumbing - Proposal for interior alteration at main floor and second floor

    Applied Dec 1, 2025 · issued Dec 5, 2025 · completed Jun 24, 2026 · Permit 25 260858 PLB

    Closed
  • Small residential project · Interior alterations

    Proposal for interior alteration at main floor and second floor.

    Applied Dec 1, 2025 · issued Dec 5, 2025 · completed Jun 24, 2026 · Permit 25 260858 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    Proposal to construct a one-storey front addition on the first floor, a one-storey side addition on the second floor and a two-storey rear addition.

    Decision: Approved (hearing Jun 22, 2023)

    Filed May 15, 2023 · File A0271/23NY

    Approved

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 118 Armour Blvd · Minor variance

    To enlarge the existing driveway and addition of in-ground pool.

    150 m away · filed Oct 30, 2024 · Approved

  • 96 Westgate Blvd · Minor variance

    To construct a new detached dwelling.

    190 m away · filed Feb 7, 2024 · Approved

  • 142 Armour Blvd · Minor variance

    Proposal to construct a two storey and basement rear addition, and a rear deck.

    50 m away · filed Sep 14, 2023 · Approved

  • 308 Ridley Blvd · Minor variance

    Proposal to construct a two storey front addition, a front covered porch, a rear deck, interior alterations to main floor and basement, and a detached garage in the rear yard.

    230 m away · filed Aug 24, 2022 · Approved

  • 112 Armour Blvd · Minor variance

    Proposal to construct a new one-storey rear addition to the existing dwelling.

    210 m away · filed Jun 26, 2022 · Approved

  • 7 Westgate Cres · Minor variance

    Proposal for a second floor addition, and ground floor expansion along side of existing single family dwelling.

    180 m away · filed Apr 5, 2022 · Approved

  • 186 Armour Blvd · Minor variance

    To construct a second storey addition to the existing dwelling.

    220 m away · filed May 21, 2021 · Approved

  • 151 Armour Blvd · Minor variance

    To construct a second storey addition over the existing garage.

    90 m away · filed Apr 28, 2021 · Approved

Everything planned in York Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.