Toronto address · Ward 9, Davenport
148A Bartlett Ave
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal for window replacement and interior alterations to basement, ground floor, and second floor of existing 3 storey dwelling unit.
Applied Jul 22, 2021 · issued Aug 5, 2021 · completed Nov 22, 2022 · Permit 21 188465 HVA
- Closed
Plumbing
Plumbing - Proposal for window replacement and interior alterations to basement, ground floor, and second floor of existing 3 storey dwelling unit.
Applied Jul 22, 2021 · issued Aug 5, 2021 · completed Nov 23, 2022 · Permit 21 188465 PLB
- Closed
Small residential project · Interior alterations
Proposal for window replacement and interior alterations to basement, ground floor, and second floor of existing 3 storey dwelling unit.
Applied Jul 22, 2021 · issued Aug 5, 2021 · completed Nov 28, 2022 · Permit 21 188465 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Approved
Neighbours’ Committee of Adjustment files within 250 m
195 Hallam St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition with a rear balcony.
210 m away · filed Jan 15, 2026 · Approved
79 Bartlett Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear walkway. Also, to alter the existing one-storey ancillary building (rear detached garage, abutting the laneway) by constructing a complete second storey addition for one laneway suite. There will be a total of two residential dwelling units on this lot (one in the main dwelling and one in the ancillary building).
220 m away · filed Oct 24, 2024 · Approved
725 Gladstone Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear second storey addition above the existing rear one-storey addition with a Juliet balcony, that will cantilever over the existing rear basement walkout. The existing ancillary building (detached garage), in the rear yard, abutting the laneway, will be maintained and unaltered.
110 m away · filed Jun 7, 2024 · Approved
1119 Dufferin St · Minor variance
To construct a new three-storey detached dwelling (triplex) with rear decks on the ground, second, and third levels, a front third storey rooftop terrace above the front cantilevered second storey portion of the dwelling, and a front landing with stairs.
210 m away · filed Mar 4, 2024 · Approved
99 Bartlett Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by reconstructing the front stairs, and enclosing the front porch.
180 m away · filed Feb 13, 2024 · Approved
181 Hallam St · Minor variance
To alter the existing two-storey townhouse dwelling by reconstructing and enlarging the rear one-storey addition with a rear ground floor deck and reconstructing the rear basement walkout.
240 m away · filed Jan 23, 2024 · Approved
129 Shanly St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition, a rear second storey addition, a rear ground floor deck (to replace the existing rear ground floor deck), a front second floor box bay window (to replace the existing bay window) with a front third storey balcony above, and second and third floor rear balconies.
180 m away · filed Nov 22, 2023 · Approved
216 Westmoreland Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear third storey addition with a rear third storey deck.
250 m away · filed Nov 16, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.