Toronto address · Ward 4, Parkdale-High Park
149 Evelyn Ave
The City of Toronto has 5 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - proposal for interior alterations
Applied Jan 22, 2024 · issued Feb 20, 2024 · completed Jan 15, 2026 · Permit 23 237509 HVA
- Closed
Plumbing
Plumbing - proposal for interior alterations
Applied Dec 20, 2023 · issued Dec 28, 2023 · completed Jan 13, 2026 · Permit 23 237509 PLB
- Closed
Small residential project · Interior alterations
proposal for interior alterations
Applied Dec 20, 2023 · issued Dec 22, 2023 · completed Jan 13, 2026 · Permit 23 237509 BLD
- Closed (dormant)
Plumbing
relocate fix. 1st fl: 1 2-comp. kit. sink, -----cost included under file #01-124112
Applied Sep 12, 2001 · issued Sep 13, 2001 · completed Jun 8, 2026 · Permit 01 176308 PLB
- Closed (dormant)
Small residential project · Multiple projects
construct first floor and basement addition with uncovered platform at rear, also make interior alterations CARD PRINTED
Applied Apr 3, 2001 · issued Apr 3, 2001 · completed Jun 8, 2026 · Permit 01 124112 CMB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
70 homes · Residential
470 m away · Condominium · Approved · filed Mar 1, 2023
Neighbours’ Committee of Adjustment files within 250 m
59 Fairview Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a new rear two-storey addition with a ground floor deck. The existing rear one-storey addition will be demolished.
120 m away · filed Mar 14, 2025 · Approved
86 Fairview Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a side (north) third storey dormer addition, a rear ground floor deck, a rear basement walkout staircase and reconstructing/enlarging the front covered porch.
200 m away · filed Sep 29, 2023 · Approved
103 Evelyn Ave · Minor variance
To legalize and to maintain the ground level rear addition that was constructed without an authorized building permit. Also, to construct a rear second floor balcony.
200 m away · filed Apr 20, 2023 · Approved
11 Fairview Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition, a rear basement addition, a complete third floor addition, a rear ground floor deck, and a third floor balcony.
160 m away · filed Jan 17, 2023 · Approved
89 Fairview Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear ground floor addition with a rear deck and stairs, a third storey addition and to enclose the front porch.
180 m away · filed Dec 7, 2022 · Approved
59 Gilmour Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition with a rooftop deck (above the second storey portion of the dwelling).
220 m away · filed Oct 7, 2022 · Approved
98 Evelyn Cres · Minor variance
To alter the existing two-storey detached dwelling by constructing a front one-storey addition with a new front porch and stairs, a new front canopy and a new second storey front balcony. Also, to alter the existing ancillary building (rear one-storey detached garage) by constructing a new roof and new dormers.
160 m away · filed Jan 26, 2022 · Approved
41 Gilmour Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a two-storey rear addition with a ground floor deck and a second floor deck.
210 m away · filed May 6, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.