Toronto address · Ward 20, Scarborough Southwest
15 Broderick Pl
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Other
Rooftop Solar Panel Installation
Applied Aug 13, 2024 · issued Aug 23, 2024 · completed Nov 21, 2024 · Permit 24 197217 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
27 storeys · 314 homes · Residential
440 m away · Site plan · Under appeal · filed Sep 14, 2022
Neighbours’ Committee of Adjustment files within 250 m
1 Broderick Pl · Minor variance
To alter the existing two-storey detached dwelling by constructing a three-storey rear yard addition, front yard balcony and to convert the single-family dwelling into a multiplex. There will be a total of 3 dwelling units on the lot. This application was previously deferred at the November 5, 2025 hearing.
80 m away · filed Sep 9, 2025 · Refused
55 Moreau Trl · Minor variance
To construct a new ground floor rear deck with walkout.
230 m away · filed Sep 28, 2023 · Approved
9 Moreau Trl · Minor variance
To legalize and maintain the existing rear deck addition.
150 m away · filed Apr 15, 2021 · Approved
1 Broderick Pl · Minor variance
To construct a new exterior stair on the south-west side of the dwelling. The proposed new stair will connect to an existing exterior balcony.
80 m away · filed Feb 8, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.