Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

15 Donald Ave

The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    To alter the front of the existing one-storey dwelling with a fully exposed basement, by constructing: a one-storey addition and basement entrance; a garage extension; and a new open porch and staircase leading to the main floor of the dwelling

    Applied Aug 29, 2005 · issued Sep 29, 2005 · Permit 05 175748 BLD

    Work not started

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 14 Haverson Blvd · Minor variance

    To construct a second storey addition above the existing dwelling.

    80 m away · filed Jul 31, 2026 · Approved

  • 402 Blackthorn Ave · Minor variance

    To enclose the existing rear porch.

    240 m away · filed Mar 18, 2025 · Approved

  • 68 Haverson Blvd · Minor variance

    To legalize and to maintain the new dwelling with a detached garage in the rear yard that is currently under construction. A previous Committee of Adjustment application (A0483/20EYK) approved a second storey addition above the existing dwelling, a two-storey rear addition and a rear detached garage with variances related to floor space index, length, depth, lot coverage of an ancillary structure and side yard setback of an ancillary structure.

    140 m away · filed Jun 9, 2023 · Approved

  • 70 Haverson Blvd · Minor variance

    To construct a new dwelling.

    170 m away · filed Jan 27, 2023 · Approved

  • 68 Haverson Blvd · Minor variance

    To legalize and to maintain the new dwelling with a detached rear garage that is currently under construction. A previous Committee of Adjustment application (A0483/20EYK) approved a second storey addition above the existing dwelling, a two-storey rear addition and a rear detached garage with variances related to floor space index, length, depth, lot coverage of an ancillary structure and side yard setback of an ancillary structure.

    140 m away · filed Apr 27, 2022 · Refused

  • 76 Haverson Blvd · Minor variance

    To construct a new detached dwelling with an attached garage.

    180 m away · filed Feb 7, 2022 · Approved

  • 47 Harlton Cres · Minor variance

    To construct a new detached dwelling with an attached garage.

    150 m away · filed Jan 31, 2022 · Approved

  • 18 Harlton Cres · Minor variance

    To construct a two-storey front addition, a third floor addition and to create a secondary suite.

    180 m away · filed Jan 11, 2022 · Approved

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.