Toronto address · Ward 21, Scarborough Centre
15 Princemere Cres
The City of Toronto has 3 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Porch
Proposal to construct a wood deck to enlarge existing front porch.
Applied May 30, 2024 · issued Jun 3, 2024 · completed Oct 3, 2024 · Permit 24 157076 BLD
- Cancelled
Small residential project · Porch
Proposal to construct a wood deck to enlarge existing front porch
Applied May 17, 2024 · completed May 23, 2024 · Permit 24 150767 BLD
- Closed
Small residential project · Carport
Construction of a carport
Applied Apr 24, 2017 · issued Oct 4, 2024 · completed Sep 5, 2025 · Permit 17 148052 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To permit a carport constructed on the south side of the property without the benefit of a building permit.
Decision: Approved (hearing Sep 23, 2020)
Filed Jul 13, 2020 · File A0171/20SC
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
182 Tower Dr · Minor variance
To construct a new two-storey detached building (triplex) with a front porch, front second storey balcony, side (east) basement walkout, rear ground floor deck and rear second storey balcony. Also, to construct a two-storey ancillary building containing a garden suite (garage on the ground floor and dwelling unit above) with vehicular access from Pickwick Road in the rear yard. The existing one-storey detached dwelling and detached garage will be demolished. There will be a total of four dwelling units on the lot.
150 m away · filed Apr 9, 2025 · Approved
192 Tower Dr · Minor variance
To construct a new side yard carport to the existing dwelling.
210 m away · filed Nov 20, 2024 · Approved
198 Tower Dr · Minor variance
To alter the existing one-storey detached dwelling by constructing a second storey addition, a rear two-storey addition and interior alterations. There will be a total of four dwelling units on the property. This application was previously deferred at the April 9, 2025 hearing.
250 m away · filed Nov 4, 2024 · Approved
126 Elinor Ave · Minor variance
To demolish existing dwelling and to construct a new two-storey detached dwelling.
220 m away · filed Jan 9, 2023 · Approved
169 Tower Dr · Minor variance
To construct a second storey addition over the existing dwellling, a new garage, and a rear deck.
150 m away · filed Jan 8, 2021 · Approved
24 Tardree Pl · Minor variance
To construct a new two-storey detached garage in the rear yard. This application was deferred at the July 23, 2020 virtual hearing due to concerns from Planning staff. Revisions have been made, and the owner wishes to return to the Committee.
200 m away · filed Jan 29, 2020 · Approved
3 Princemere Cres · Minor variance
The applicant is seeking relief from the provisions of the Zoning By-law to construct a new two storey side and rear addition and a second storey additions over the existing single family residential dwelling.
70 m away · filed Jan 17, 2019 · Approved
173 Tower Dr · Minor variance
To construct a new front porch, a two-storey rear addition, a second storey addition over the existing dwelling, a carport and interior and exterior alterations.
170 m away · filed May 18, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.