Toronto address · Ward 18, Willowdale
150 Connaught Ave
The City of Toronto has 6 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Small residential project · Multiple projects
Revision 02 - Proposal to revise the size of the deckRevision 01 - basement floor plan to change unexcavated area to proposed storageProposed addition to the ground floor and interior alterations to the basement and ground floor
Applied Aug 14, 2020 · completed Dec 10, 2020 · Permit 18 269907 BLD (revision 02)
- Revision issued
Small residential project · Multiple projects
Revision 01 - basement floor plan to change unexcavated area to proposed storageProposed addition to the ground floor and interior alterations to the basement and ground floor
Applied Aug 30, 2019 · issued Sep 9, 2019 · Permit 18 269907 BLD (revision 01)
- Closed
Plumbing
Plumbing - Proposed addition to the ground floor and interior alterations to the basement and ground floor
Applied Aug 14, 2019 · issued Aug 21, 2019 · completed Oct 28, 2020 · Permit 18 269907 PLB
- Closed
Drains and site services
Drain - Proposed addition to the ground floor and interior alterations to the basement and ground floor
Applied Aug 14, 2019 · issued Aug 14, 2019 · completed Oct 28, 2020 · Permit 18 269907 DRN
- Inspections under way
Small residential project · Multiple projects
Proposed addition to the ground floor and interior alterations to the basement and ground floor
Applied Dec 18, 2018 · issued Mar 13, 2019 · Permit 18 269907 BLD
- Closed
Heating and ventilation
HVAC - Proposed addition to the ground floor and interior alterations to the basement and ground floor
Applied Dec 18, 2018 · issued Apr 15, 2019 · completed Oct 28, 2020 · Permit 18 269907 HVA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · NR addition
To construct a ground floor addition.
Decision: Approved (hearing Nov 8, 2018)
Filed Oct 2, 2018 · File A0695/18NY
What’s planned nearby
Development sites within 500 m
- Under review
Not stated in the file
260 m away · Rezoning · Under review · filed Feb 25, 2025
- Under review
3 storeys · Residential
260 m away · Site plan · Under review · filed Oct 17, 2024
Neighbours’ Committee of Adjustment files within 250 m
207 Connaught Ave · Minor variance
To permit two additional dwelling units, in the basement of the existing Fourplex., for a total of six dwelling units in the building. The existing Garden Suite to be maintained.
240 m away · filed Apr 16, 2026 · Refused
123 Patricia Ave · Minor variance
To construct an extension to the existing deck at the rear of the existing dwelling.
110 m away · filed Feb 25, 2026 · Approved
99 Patricia Ave · Minor variance
To construct a fourplex with a front porch and a two-storey garden suite in the rear yard.
240 m away · filed Jan 29, 2026 · Approved
164 Homewood Ave · Minor variance
To construct a new fourplex dwelling and a garden suite.
210 m away · filed Feb 20, 2025 · Approved
199 Connaught Ave · Minor variance
To construct a new dwelling with a second suite.
210 m away · filed Jan 6, 2025 · Approved
180 Connaught Ave · Minor variance
To construct a new deck. NOTE: This application was previously deferred at the Committee of Adjustment hearing on November 7, 2024.
120 m away · filed Sep 27, 2024 · Approved
132 Homewood Ave · Minor variance
To construct a new dwelling.
230 m away · filed Jan 19, 2024 · Approved
130 Homewood Ave · Minor variance
To construct a new detached dwelling.
240 m away · filed Oct 12, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.