Toronto address · Ward 19, Beaches-East York
1501 Woodbine Ave
The City of Toronto has 8 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Addition or alteration · Other
Proposal to construct a new garbage enclosure.
Applied Apr 1, 2025 · issued Nov 21, 2025 · completed Jun 24, 2026 · Permit 25 137908 BLD
- Closed
Fire and security upgrade · Fire alarm
Proposed installation of new fire alarm speakers in the residential units.
Applied Aug 9, 2024 · issued Sep 9, 2024 · completed Nov 21, 2025 · Permit 24 195294 FSU
- Inspections under way
Fire and security upgrade · Electromagnetic locks
Install maglock at basement and sub basement from building to garage
Applied Mar 2, 2023 · issued Mar 30, 2023 · Permit 23 119199 FSU
- Inspections under way
Fire and security upgrade · Fire alarm
Replace fire alarm
Applied Sep 9, 2022 · issued Sep 30, 2022 · Permit 22 201411 FSU
- Closed
Addition or alteration · Garage Repair/Reconstruction
Proposal for concrete repairs to the P1 level parking garage in existing apartment building.
Applied May 3, 2017 · issued May 29, 2017 · completed Jan 28, 2020 · Permit 17 153576 BLD
- Closed
Designated structure · Sign building permit related
In conjunction with a multi-storey apartment building on the premises, proposal to erect and display two illuminated ground signs, displaying static copy, located on the south and west frontages. The proposed signs contain two sign faces, each sign face measuring 2.59 metres vertically by 1.17 metres horizontally at a height of 3.14 metres above grade.**METCAP LIVING**
Applied Feb 3, 2017 · issued Aug 17, 2018 · completed Apr 9, 2019 · Permit 17 112730 DST
- Closed
Addition or alteration · Balcony/Guard repairs
Proposal to repair the balcony and guards on the existing apartment building
Applied Oct 26, 2016 · issued Oct 27, 2016 · completed Jan 28, 2020 · Permit 16 242771 BLD
- Closed (dormant)
Addition or alteration · Other
install telecom equipment in P2
Applied Feb 6, 2002 · issued Mar 15, 2002 · completed Jun 8, 2026 · Permit 02 108635 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
16 Trenton Ave · Minor variance
To construct a new two-storey detached dwelling and to permit as well as maintain the exterior walls constructed above grade and interior alterations to the ground floor constructed beyond building permit. Also, to construct a new one-storey ancillary building (detached garage) in the rear yard with vehicular access from Rumney Road. There will be a total of two residential dwelling units on this lot (one unit occupying the basement and one unit occupying the first and second levels). Note: As more than 50% of the existing exterior walls have been removed to alter the existing one-storey dwel…
120 m away · filed Sep 23, 2025 · Approved
661 O'Connor Dr · Minor variance
To construct a new three-storey apartment building with front and rear basement walkouts, front and side (west) porches, a side (west) third storey balcony, as well as fourth storey rooftop decks with staircase enclosures and pergolas. Also, to construct a new rear detached ancillary building (with a maximum height of 5.87 m), containing six stacked vehicular parking spaces, and a driveway along the west side yard of the property. There will be a total of 10 residential dwelling units on this lot.
220 m away · filed Sep 19, 2025 · Approved
7 Trenton Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by extending the rear second floor balcony. Also, to construct a new one-storey detached ancillary building (one-car garage) in the rear yard.
150 m away · filed Aug 20, 2025 · Approved
16 Trenton Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a front covered porch, a side (west) basement walkout, a rear ground floor deck, and a rear second storey juliet balcony. The roof of the rear one-storey ancillary building (detached garage) will be raised. There will be a total of two residential dwelling units on this lot (one unit occupying the basement and one unit occupying the first and second levels).
120 m away · filed May 9, 2025 · Approved
11 Ventnor Ave · Minor variance
To convert the existing two-storey detached multi-tenant house (containing 8 residential dwelling rooms and one basement dwelling unit) into a single family dwelling. Also, to permit the existing rear one-storey addition, a rear staircase, and two sheds in the rear yard.
80 m away · filed Apr 22, 2025 · Application withdrawn
35 Rednor Rd · Minor variance
To construct a new two-storey detached dwelling with a rear enclosed deck. Also, to construct a new detached ancillary structure (two car garage) with vehicular access from Plains Road. The existing one-storey detached dwelling will be demolished.
240 m away · filed Oct 13, 2023 · Approved
750 O'Connor Dr · Minor variance
To alter the existing one-and-one-half-storey detached dwelling by constructing a complete second storey addition, first and second storey terraces (along the east side), and rear ground floor raised deck.
180 m away · filed Oct 12, 2022 · Approved
17 Trenton Ave · Minor variance
To alter the existing raised bungalow by constructing a complete second storey addition, a three-storey east side and south rear addition (with a front integral garage), a new front porch and steps (with a walkout basement), and a new rear deck (maintaining the existing walkout basement).Also, there will be one primary unit and one secondary suite within this dwelling.
150 m away · filed May 10, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.