Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

151 Dewhurst Blvd

The City of Toronto has 3 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Finishing basements

    Proposal to legalize and to maintain the rear basement walkout with a ground floor concrete deck and staircase, which was constructed without an authorized building permit.

    Applied Aug 16, 2024 · issued Aug 21, 2024 · completed Apr 14, 2025 · Permit 24 199540 BLD

    Closed
  • Small residential project · Multiple projects

    Proposal to construct new cold room addition with covered concrete porch above and new basement walkout in rear yard of existing detached single family dwelling.

    Applied Oct 30, 2014 · issued Jun 13, 2024 · completed Apr 14, 2025 · Permit 14 245407 BLD

    Closed
  • Drains and site services

    Drain - Proposal to construct new cold room addition with covered concrete porch above and new basement walkout in rear yard of existing detached - sfd.

    Applied Oct 30, 2014 · issued Jun 13, 2024 · completed Apr 14, 2025 · Permit 14 245407 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Recognize existing

    To legalize and to maintain the rear basement walkout with a ground floor concrete deck and staircase, which was constructed without an authorized building permit.

    Decision: Approved (hearing May 15, 2024)

    Filed Mar 1, 2024 · File A0284/24TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 98 Dewhurst Blvd · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey addition.

    190 m away · filed May 26, 2026 · Approved

  • 135 Dewhurst Blvd · Minor variance

    To construct a new one-storey detached ancillary building (one-car garage), in the rear yard, abutting Somers Avenue.

    70 m away · filed Oct 10, 2025 · Approved

  • 97 Woodycrest Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey addition with a balcony.

    210 m away · filed Mar 21, 2025 · Approved

  • 30 Milverton Blvd · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition with a rooftop deck (above the second storey), a rear two-storey addition, and a rear ground floor deck with stairs and a patio at-grade (the existing rear ground floor deck will be demolished). Also, to construct a one-storey ancillary building (shed) in the rear yard of the property.

    120 m away · filed Feb 7, 2025 · Approved

  • 21 Somers Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by enclosing the existing front porch into habitable space. The existing front stairs will be maintained.

    110 m away · filed Jan 30, 2025 · Approved

  • 19 Somers Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by enclosing the existing front porch into habitable space. The existing front stairs will be maintained.

    100 m away · filed Jan 30, 2025 · Approved

  • 120 Langford Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third floor addition with a rear third floor deck (above the second floor). Also, to construct a new one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.

    210 m away · filed Nov 28, 2024 · Approved

  • 190 Donlands Ave · Consent

    To obtain consent to sever a portion of land for the purpose of a lot addition.

    210 m away · filed May 14, 2024 · Application withdrawn

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.