Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 4, Parkdale-High Park

151 Sorauren Ave

The City of Toronto has 1 building permit since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposal for a backwater valve.

    Applied Jan 15, 2025 · issued Jan 17, 2025 · completed Mar 12, 2025 · Permit 25 104791 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To convert the basement of the 2½-storey semi-detached dwelling into a residential unit and to construct a front basement walkout.

    Decision: Approved (hearing Jun 27, 2018)

    Filed Jan 22, 2018 · File A0080/18TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 223 Sorauren Ave · Consent

    230 m away · filed May 13, 2026 · Withdrawn

  • 223 Sorauren Ave · Minor variance

    230 m away · filed May 13, 2026 · Withdrawn

  • 223 Sorauren Ave · Minor variance

    230 m away · filed May 13, 2026 · Withdrawn

  • 125 Sorauren Ave · Minor variance

    To alter the existing three-storey detached dwelling (configured as a triplex and currently used as a one-unit dwelling) by constructing a front third-floor addition and a rear addition, with a rear ground floor patio and a rear second storey deck. The existing rear exterior staircase will be demolished. There will be a total of one residential dwelling unit on the lot.

    80 m away · filed Feb 13, 2026 · Approved

  • 19 Galley Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch extension, a rear two-storey addition with a partially covered ground floor deck, and a third storey addition. Also, to construct a new one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.

    150 m away · filed Nov 10, 2025 · Approved

  • 45 Fern Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey addition, a rear ground floor deck with stairs, and one residential dwelling unit within the basement. Also, to construct a new one-storey ancillary structure (storage shed) in the rear yard. There will be a total of two residential dwelling units on this lot (one unit within the basement level, and one unit occupying the first, second, and third levels).

    150 m away · filed Sep 23, 2025 · Approved

  • 93 Pearson Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey dormer addition, ground floor addition and basement addition. Also, to construct a new rear ground floor deck with stairs.

    230 m away · filed May 7, 2025 · Approved

  • 21 Galley Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third floor addition, and rear ground floor deck with stairs. The existing rear one-storey addition with stairs will be demolished.

    140 m away · filed May 6, 2025 · Approved

Everything planned in Parkdale-High Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.