Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

1518 Dundas St W

The City of Toronto has 3 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Multiple projects

    Proposal to convert rear detached garage into a dwelling unit. Scope of work includes a 3rd floor addition above garage, interior alterations, new deck, and maintaining parking space.

    Applied May 9, 2018 · issued Oct 31, 2018 · completed Dec 13, 2019 · 1 home added · Permit 18 156022 BLD

    Cancelled
  • Heating and ventilation

    HVAC - Proposal to convert rear detached garage into a dwelling unit. Scope of work includes a 3rd floor addition above garage, interior alterations, new deck, and maintaining parking space.

    Applied May 9, 2018 · issued Oct 31, 2018 · completed Dec 13, 2019 · Permit 18 156022 HVA

    Cancelled
  • Plumbing

    Plumbing - Proposal to convert rear detached garage into a dwelling unit. Scope of work includes a 3rd floor addition above garage, interior alterations, new deck, and maintaining parking space.

    Applied May 9, 2018 · issued Oct 31, 2018 · completed Dec 13, 2019 · Permit 18 156022 PLB

    Cancelled

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To alter the existing rear two-storey garage located behind a three-storey mixed used building containing ground floor commercial and two dwelling units above by constructing a third floor and converting the second and third floors of the garage into a dwelling unit. A total of three dwelling units will exist on the property.

    Decision: Approved (hearing Aug 9, 2017)

    Filed Apr 3, 2017 · File A0388/17TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 288 Gladstone Ave · Minor variance

    To alter the existing rear one-storey ancillary building (detached garage, abutting Parr Street and Macklem Avenue) by constructing a complete second storey addition with cantilever extensions to the north and east sides. This ancillary building will contain a garden suite located on the second level. Also, there will be a total of two residential dwelling units on the lot (one unit occupying the main dwelling, and one unit occupying the ancillary building).

    220 m away · filed Sep 16, 2026 · Postponed

  • 1596 Dundas St W · Minor variance

    To alter the existing three-storey mixed-use building (containing a ground floor commercial unit and ten residential dwelling units) by converting the existing storage space into three new residential dwelling units (two dwelling units in the basement, and one dwelling unit on the ground level). The existing 12 long-term bicycle parking spaces and 4 short-term bicycle parking spaces will be maintained and unaltered. There will be a total of 13 residential dwelling units on this lot.

    190 m away · filed Oct 20, 2025 · Approved

  • 118 Sheridan Ave · Minor variance

    To construct a new two-storey detached ancillary building (for the purpose of a lounge and storage area on the ground level, and a loft on the second level), in the rear yard of the existing two-and-one-half-storey townhouse dwelling. This ancillary building will not be used for habitable space. The existing ancillary building in the rear yard will be demolished.

    110 m away · filed May 30, 2025 · Approved

  • 1498 Dundas St W · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 953-2021), for a new 8-storey mixed-use building, by increasing the gross floor area, and portions of the building heights, and by reducing the number of residential parking spaces. There will be a total of 62 residential dwelling units on this lot.

    50 m away · filed Feb 21, 2025 · Approved

  • 646 Dufferin St · Minor variance

    To alter the development standards (as approved by Site Specific Zoning By-law 950-2021), for an eight-storey apartment building, by increasing the permitted height and the gross floor area, and to reduce a portion of the rear building setbacks and the number of parking spaces on-site. There will be a total of 168 residential dwelling units on this lot.

    70 m away · filed Oct 23, 2024 · Approved

  • 282 Gladstone Ave · Minor variance

    To alter the existing one-storey ancillary building (detached garage in the rear yard), by constructing a partial second storey addition in order to contain one garden suite (which will occupy both levels). There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).

    220 m away · filed Oct 15, 2024 · Approved

  • 646 Dufferin St · Minor variance

    To alter the development standards of the eight-storey residential building (as approved by Site Specific Zoning By-law 950-2021) by reducing a portion of the building setbacks, the first-floor height, and soft landscaping requirements.

    70 m away · filed Dec 6, 2023 · Approved

  • 174 Sheridan Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a one-storey rear addition (to replace the existing rear one-storey addition with stairs).

    210 m away · filed Jul 29, 2023 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.