The City of Toronto has 7 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal to construct a new 2 storey single family dwelling and demolish the existing 2 storey single family dwelling

    Applied Oct 17, 2019 · issued Oct 31, 2019 · completed Sep 1, 2021 · Permit 19 152659 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct a new 2 storey single family dwelling and demolish the existing 2 storey single family dwelling

    Applied May 10, 2019 · issued Jun 4, 2019 · completed Feb 1, 2021 · Permit 19 152659 PLB

    Closed
  • New house · New building

    Proposal to construct a new 2 storey single family dwelling and demolish the existing 2 storey single family dwelling

    Applied May 10, 2019 · issued Jun 4, 2019 · completed Jul 20, 2021 · 1 home added · Permit 19 152659 BLD

    Closed
  • Demolition

    Proposal to demolish existing 2 storey single family dwelling to construct a new 2 storey single family dwelling

    Applied May 10, 2019 · issued Jun 6, 2019 · completed Feb 1, 2021 · 1 home removed · Permit 19 152672 DEM

    Closed
  • Drains and site services

    Drain - Proposal to construct a new 2 storey single family dwelling and demolish the existing 2 storey single family dwelling

    Applied May 10, 2019 · issued Jun 4, 2019 · completed Feb 1, 2021 · Permit 19 152659 DRN

    Closed
  • Plumbing

    Plumbing - Proposed underpinning to basement

    Applied Oct 12, 2010 · issued Oct 12, 2010 · completed Sep 11, 2019 · Permit 10 223664 PLB

    Closed
  • Small residential project · Underpinning

    Proposed underpinning to basement

    Applied Jul 19, 2010 · issued Jul 21, 2010 · completed Sep 11, 2019 · Permit 10 223664 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new 2½-storey detached dwelling containing a rear ground floor deck, a rear 2nd storey deck, and an integral garage.

    Decision: Approved (hearing Jan 23, 2019)

    Filed Aug 10, 2018 · File A0777/18TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 143 Strathearn Rd · Minor variance

    To construct a new three-storey detached dwelling with a front integral two-car garage, a widened driveway, a front porch with a canopy and stairs, a rear basement walkout, a rear covered ground floor deck with stairs, a rear second floor terrace, a rear covered third floor terrace, and a rear in-ground swimming pool. Also, to construct an ancillary structure (pool equipment pad), in the rear yard, abutting the west side lot line.

    250 m away · filed Aug 31, 2026 · Hearing scheduled

  • 51 Warwick Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear partial one-storey addition (including a basement level) with a L-shaped rear deck with stairs and a rear basement walkout. The existing rear deck and stairs will be removed.

    180 m away · filed Aug 11, 2026 · Hearing scheduled

  • 125 Ava Rd · Minor variance

    To construct a new two-storey detached dwelling with a front integral garage, a front covered porch with stairs, a side (west) porch with stairs, a rear basement walkout, and a rear ground floor concrete deck with stairs. Also, to reconstruct the front driveway, abutting Ava Road.

    80 m away · filed Jan 15, 2026 · Approved

  • 163 Ava Rd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a two-storey front addition (extension to the integral garage), a rear two-storey addition, a partial third storey addition (loft area), and a rear ground floor deck. Also, to construct an inground swimming pool in the rear yard.

    180 m away · filed Jan 13, 2026 · Approved

  • 136 Strathearn Rd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a side (north) second storey addition (above the existing attached garage), a rear one-storey addition, a covered front porch with stairs, and a rear ground floor deck and paved court.

    190 m away · filed Feb 24, 2025 · Approved

  • 155 Glen Cedar Rd · Minor variance

    To construct a new three-storey detached dwelling with an integral garage and a widened driveway, a partially covered front porch with stairs and a front architectural feature (pilaster), a rear ground floor covered porch, a rear stone terrace at-grade with a hot tub, and a rear basement walkout with a lower terrace, a rear second floor juliet balcony, and a rear third floor balcony.

    50 m away · filed Feb 12, 2025 · Approved

  • 45 Warwick Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear one-storey addition with a deck and stairs, a complete second storey west side addition, and a rear basement walkout. There will be two residential dwelling units on this lot.

    170 m away · filed Dec 9, 2024 · Approved

  • 42 Avenal Dr · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, a covered front porch with stairs, a rear ground floor terrace and an oversized driveway. The existing rear detached garage will be demolished.

    150 m away · filed Aug 8, 2024 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.