Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

155 Hillmount Ave

The City of Toronto has 6 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Deck

    Rev 01 - Proposed revision to increase the size of the rear deck for existing single family dwelling.Proposal to construct new wood deck

    Applied Apr 13, 2018 · issued Apr 23, 2018 · completed Sep 1, 2026 · Permit 17 253605 BLD (revision 01)

    Closed
  • Small residential project · Deck

    Proposal to construct new wood deck

    Applied Oct 26, 2017 · issued Apr 9, 2018 · completed Sep 1, 2026 · Permit 17 253605 BLD

    Closed
  • Drains and site services

    Install drains for sfd

    Applied Dec 8, 2004 · issued Jan 10, 2005 · Permit 04 198926 DRN

    Inspections under way
  • Heating and ventilation

    HVAC - New single family dwelling. - New Building

    Applied Sep 21, 2004 · issued Jan 10, 2005 · Permit 04 167119 HVA

    Inspections under way
  • New house · New building

    New single family dwelling.

    Applied Aug 18, 2004 · issued Sep 28, 2004 · Permit 04 167119 BLD

    Inspections under way
  • Plumbing

    Plumbing -Install new fixtures. New single family dwelling. - New Building

    Applied Aug 18, 2004 · issued Sep 28, 2004 · Permit 04 167119 PLB

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To legalize and enlarge existing deck.

    Decision: Refused (hearing Mar 21, 2018)

    Filed Jan 5, 2018 · File A0013/18NY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 131 Hillmount Ave · Minor variance

    To construct a new dwelling with covered front and rear porches.

    120 m away · filed Sep 8, 2026 · Hearing scheduled

  • 164 Viewmount Ave · Minor variance

    To construct a new detached dwelling withan integral garage, as well as a west side entry porch and balcony, and a rear patio and balcony. Please note this application was previously deferred at the March 26, 2026 Committee of Adjustment Public Hearing.

    80 m away · filed Jan 20, 2026 · Approved

  • 165 Viewmount Ave · Minor variance

    Proposal to construct new 2 storey single family dwelling.

    120 m away · filed Nov 22, 2022 · Approved

  • 165 Viewmount Ave · Minor variance

    Proposal to construct a new two-storey single family dwelling.

    120 m away · filed Aug 3, 2022 · Refused

  • 681 Glencairn Ave · Consent

    To obtain consent to sever the property into two undersized residential lots.

    190 m away · filed Dec 30, 2021 · Approved

  • 681 Glencairn Ave · Minor variance

    Proposal to construct a new dwelling.

    190 m away · filed Dec 30, 2021 · Approved

  • 681 Glencairn Ave · Minor variance

    Proposal to construct a new dwelling.

    190 m away · filed Dec 30, 2021 · Approved

  • 161 Hillmount Ave · Minor variance

    To construct a new two (2) storey single family dwelling with integral garage, partially covered rear concrete deck and basement walkout.

    40 m away · filed Nov 24, 2021 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.