Toronto address · Ward 5, York South-Weston
1551 Weston Rd
The City of Toronto has 22 building permits since 2017 (15 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Application on hold
Fire and security upgrade
FS - Sprinkler Shop Drawing - Interior alterations to existing storage mezanine and new loading dock
Applied Feb 24, 2021 · Permit 20 233262 FSU
- Permit issued
Addition or alteration · Multiple projects
Interior alterations to existing storage mezanine and new loading dock
Applied Dec 22, 2020 · issued Feb 24, 2021 · Permit 20 233262 BLD
- Permit issued
Heating and ventilation
HVAC - Interior alterations to existing storage mezanine and new loading dock
Applied Dec 22, 2020 · issued Feb 24, 2021 · Permit 20 233262 HVA
- Revision issued
Addition or alteration · Addition(s)
Revision - Adding a new mezzanine in the new combined heat and power plant being constructed under original submission.New building addition to existing industrial manufacturing facility to house new equipment parts storage area and new service area for new combined heat and power plant.
Applied Sep 11, 2020 · issued Nov 18, 2020 · Permit 19 183248 BLD (revision 01)
- Inspections under way
Addition or alteration · Re-Roofing/Re-Cladding
Proposal to replace collapsed roof due to storm damage
Applied Aug 10, 2020 · issued Sep 21, 2020 · Permit 20 178280 BLD
- Closed
Fire and security upgrade
FS - Sprinkler Shop Drawing - New building addition to existing industrial manufacturing facility to house new equipment parts storage area and new service area for new combined heat and power plant.
Applied Aug 15, 2019 · completed May 4, 2020 · Permit 19 183248 FSU
- Closed
Heating and ventilation
HVAC - New building addition to existing industrial manufacturing facility to house new equipment parts storage area and new service area for new combined heat and power plant.
Applied Jul 5, 2019 · issued Sep 9, 2019 · completed Mar 28, 2022 · Permit 19 183248 HVA
- Inspections under way
Drains and site services · Site service
Drain - New building addition to existing industrial manufacturing facility to house new equipment parts storage area and new service area for new combined heat and power plant.
Applied Jul 5, 2019 · issued Aug 20, 2019 · Permit 19 183248 STS
- Inspections under way
Plumbing
Plumbing - New building addition to existing industrial manufacturing facility to house new equipment parts storage area and new service area for new combined heat and power plant.
Applied Jul 5, 2019 · issued Aug 15, 2019 · Permit 19 183248 PLB
- Inspections under way
Addition or alteration · Addition(s)
New building addition to existing industrial manufacturing facility to house new equipment parts storage area and new service area for new combined heat and power plant.
Applied Jul 5, 2019 · issued Aug 15, 2019 · Permit 19 183248 BLD
- Inspections under way
Addition or alteration · Interior alterations
Interior demolition and alteration including beam and floor reinforcement for structural support of new equipment.
Applied Apr 12, 2013 · issued May 21, 2013 · Permit 13 149037 BLD
- Permit issued
Addition or alteration · Interior alterations
Interior alterations to reduce the size of the control room
Applied Apr 3, 2013 · issued Jun 12, 2013 · Permit 13 143374 BLD
Show 10 more permits
- Application on hold
Fire and security upgrade
FS - Sprinkler Shop Drawing - Demolish part of south exterior wall and add (5) stories for service access platform. Add small platform at fifth floor. New stairs ground to second floor. Partial new roof.
Applied Jul 6, 2012 · Permit 12 178207 FSU
- Inspections under way
Addition or alteration · Multiple projects
Demolish part of south exterior wall and add (5) stories for service access platform. Add small platform at fifth floor. New stairs ground to second floor. Partial new roof.
Applied May 23, 2012 · issued Jul 16, 2012 · Permit 12 178207 BLD
- Inspections under way
Plumbing
Plumbing - Demolish part of south exterior wall and add (5) stories for service access platform. Add small platform at fifth floor. New stairs ground to second floor. Partial new roof.
Applied May 23, 2012 · issued Jul 16, 2012 · Permit 12 178207 PLB
- Closed
Addition or alteration · Interior alterations
Replace cracked wood beam with steel beam in corridor
Applied Feb 1, 2010 · issued Feb 19, 2010 · completed Sep 8, 2026 · Permit 10 112315 BLD
- Closed
Addition or alteration · Addition(s)
Addition - Penthouse - Equipment enclosure to industrial building
Applied Sep 23, 2003 · issued Oct 17, 2003 · completed Sep 8, 2026 · Permit 03 178030 BLD
- Closed
Addition or alteration · Interior alterations
Interior alterations to Warehouse - industrial building to create medical/change rooms facility for employees only
Applied Aug 21, 2003 · issued Oct 9, 2003 · completed Sep 8, 2026 · Permit 03 168427 BLD
- Inspections under way
Heating and ventilation
HVAC - Interior alterations to Warehouse - industrial building to create medical/change rooms facility for employees only - Interior Alterations
Applied Aug 21, 2003 · issued Oct 9, 2003 · Permit 03 168427 HVA
- Inspections under way
Plumbing
Plumbing - Interior alterations to Warehouse - industrial building to create medical/change rooms facility for employees only - Interior Alterations
Applied Aug 21, 2003 · issued Oct 9, 2003 · Permit 03 168427 PLB
- Closed (dormant)
Addition or alteration · Other
installation of two new acess doors for unloading area and reclocate existing exit stairs
Applied Jul 15, 2002 · issued Sep 27, 2002 · completed Jun 8, 2026 · Permit 02 153741 BLD
- Closed (dormant)
Non-residential building permit · Alteration to existing building
Applied Aug 3, 2000 · issued Aug 3, 2000 · completed Jun 8, 2026 · Permit 00 324924 CMB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
4 Edmund Avenue and 1550 Weston Road
8 storeys · Residential
110 m away · Site plan · Approved · filed Jan 27, 2022
- Under review
9 storeys · 59 homes · Mixed use
440 m away · Rezoning · Under review · filed Jul 23, 2021
- Under review
1693-1707 Weston Road and 6-10 Victoria Avenue East
43 storeys · Not stated in the file
490 m away · Rezoning · Under review · filed Apr 21, 2026
Neighbours’ Committee of Adjustment files within 250 m
1552 Weston Rd · Consent
To obtain consent sent to sever the property into 2 lots and to create various easements/ rights-of-ways.
90 m away · filed Jul 29, 2025 · Approved
1552 Weston Rd · Minor variance
To maintain the existing residential building.
90 m away · filed Jul 29, 2025 · Approved
1552 Weston Rd · Minor variance
To construct an eight-storey residential building.
90 m away · filed Jul 29, 2025 · Approved
1552 Weston Rd · Minor variance
To construct a new 8-storey apartment building. A total of 50 affordable housing dwelling units will be provided.
90 m away · filed Jun 28, 2023 · Approved
61 Clouston Ave · Minor variance
To construct a second storey rear deck and add two secondary suites to the existing dwelling.
150 m away · filed Jul 5, 2019 · Deferred
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.