Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

1551 Weston Rd

The City of Toronto has 22 building permits since 2017 (15 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Interior alterations to existing storage mezanine and new loading dock

    Applied Feb 24, 2021 · Permit 20 233262 FSU

    Application on hold
  • Addition or alteration · Multiple projects

    Interior alterations to existing storage mezanine and new loading dock

    Applied Dec 22, 2020 · issued Feb 24, 2021 · Permit 20 233262 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Interior alterations to existing storage mezanine and new loading dock

    Applied Dec 22, 2020 · issued Feb 24, 2021 · Permit 20 233262 HVA

    Permit issued
  • Addition or alteration · Addition(s)

    Revision - Adding a new mezzanine in the new combined heat and power plant being constructed under original submission.New building addition to existing industrial manufacturing facility to house new equipment parts storage area and new service area for new combined heat and power plant.

    Applied Sep 11, 2020 · issued Nov 18, 2020 · Permit 19 183248 BLD (revision 01)

    Revision issued
  • Addition or alteration · Re-Roofing/Re-Cladding

    Proposal to replace collapsed roof due to storm damage

    Applied Aug 10, 2020 · issued Sep 21, 2020 · Permit 20 178280 BLD

    Inspections under way
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - New building addition to existing industrial manufacturing facility to house new equipment parts storage area and new service area for new combined heat and power plant.

    Applied Aug 15, 2019 · completed May 4, 2020 · Permit 19 183248 FSU

    Closed
  • Heating and ventilation

    HVAC - New building addition to existing industrial manufacturing facility to house new equipment parts storage area and new service area for new combined heat and power plant.

    Applied Jul 5, 2019 · issued Sep 9, 2019 · completed Mar 28, 2022 · Permit 19 183248 HVA

    Closed
  • Drains and site services · Site service

    Drain - New building addition to existing industrial manufacturing facility to house new equipment parts storage area and new service area for new combined heat and power plant.

    Applied Jul 5, 2019 · issued Aug 20, 2019 · Permit 19 183248 STS

    Inspections under way
  • Plumbing

    Plumbing - New building addition to existing industrial manufacturing facility to house new equipment parts storage area and new service area for new combined heat and power plant.

    Applied Jul 5, 2019 · issued Aug 15, 2019 · Permit 19 183248 PLB

    Inspections under way
  • Addition or alteration · Addition(s)

    New building addition to existing industrial manufacturing facility to house new equipment parts storage area and new service area for new combined heat and power plant.

    Applied Jul 5, 2019 · issued Aug 15, 2019 · Permit 19 183248 BLD

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior demolition and alteration including beam and floor reinforcement for structural support of new equipment.

    Applied Apr 12, 2013 · issued May 21, 2013 · Permit 13 149037 BLD

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to reduce the size of the control room

    Applied Apr 3, 2013 · issued Jun 12, 2013 · Permit 13 143374 BLD

    Permit issued
Show 10 more permits
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Demolish part of south exterior wall and add (5) stories for service access platform. Add small platform at fifth floor. New stairs ground to second floor. Partial new roof.

    Applied Jul 6, 2012 · Permit 12 178207 FSU

    Application on hold
  • Addition or alteration · Multiple projects

    Demolish part of south exterior wall and add (5) stories for service access platform. Add small platform at fifth floor. New stairs ground to second floor. Partial new roof.

    Applied May 23, 2012 · issued Jul 16, 2012 · Permit 12 178207 BLD

    Inspections under way
  • Plumbing

    Plumbing - Demolish part of south exterior wall and add (5) stories for service access platform. Add small platform at fifth floor. New stairs ground to second floor. Partial new roof.

    Applied May 23, 2012 · issued Jul 16, 2012 · Permit 12 178207 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Replace cracked wood beam with steel beam in corridor

    Applied Feb 1, 2010 · issued Feb 19, 2010 · completed Sep 8, 2026 · Permit 10 112315 BLD

    Closed
  • Addition or alteration · Addition(s)

    Addition - Penthouse - Equipment enclosure to industrial building

    Applied Sep 23, 2003 · issued Oct 17, 2003 · completed Sep 8, 2026 · Permit 03 178030 BLD

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to Warehouse - industrial building to create medical/change rooms facility for employees only

    Applied Aug 21, 2003 · issued Oct 9, 2003 · completed Sep 8, 2026 · Permit 03 168427 BLD

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to Warehouse - industrial building to create medical/change rooms facility for employees only - Interior Alterations

    Applied Aug 21, 2003 · issued Oct 9, 2003 · Permit 03 168427 HVA

    Inspections under way
  • Plumbing

    Plumbing - Interior alterations to Warehouse - industrial building to create medical/change rooms facility for employees only - Interior Alterations

    Applied Aug 21, 2003 · issued Oct 9, 2003 · Permit 03 168427 PLB

    Inspections under way
  • Addition or alteration · Other

    installation of two new acess doors for unloading area and reclocate existing exit stairs

    Applied Jul 15, 2002 · issued Sep 27, 2002 · completed Jun 8, 2026 · Permit 02 153741 BLD

    Closed (dormant)
  • Non-residential building permit · Alteration to existing building

    Applied Aug 3, 2000 · issued Aug 3, 2000 · completed Jun 8, 2026 · Permit 00 324924 CMB

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 1552 Weston Rd · Consent

    To obtain consent sent to sever the property into 2 lots and to create various easements/ rights-of-ways.

    90 m away · filed Jul 29, 2025 · Approved

  • 1552 Weston Rd · Minor variance

    To maintain the existing residential building.

    90 m away · filed Jul 29, 2025 · Approved

  • 1552 Weston Rd · Minor variance

    To construct an eight-storey residential building.

    90 m away · filed Jul 29, 2025 · Approved

  • 1552 Weston Rd · Minor variance

    To construct a new 8-storey apartment building. A total of 50 affordable housing dwelling units will be provided.

    90 m away · filed Jun 28, 2023 · Approved

  • 61 Clouston Ave · Minor variance

    To construct a second storey rear deck and add two secondary suites to the existing dwelling.

    150 m away · filed Jul 5, 2019 · Deferred

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.