Toronto address · Ward 19, Beaches-East York
156 Glebemount Ave
The City of Toronto has 1 building permit since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Small residential project · Interior alterations
Proposal to convert ground floor retail unit into residential unit.- TOTAL OF 3 UNITS changing entire building to residential use.See also 25 147464 ZAP and 25 217122 TLAB
Applied Jun 12, 2026 · issued Aug 19, 2026 · 1 home added · Permit 26 183219 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- TLAB appeal
Minor variance · Other
To alter the existing two-storey mixed use building by converting the ground level commercial unit into one residential dwelling unit. There will be a total of three residential dwelling units on this lot.
Decision: Refused (hearing Aug 13, 2025)
Filed Jun 3, 2025 · File A0444/25TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
27 Frater Ave · Minor variance
To construct a new three-storey detached dwelling (basement level is considered the first storey), with an integral garage and a widened driveway (located on the east side), a front second storey covered porch with stairs, a rear second storey deck with stairs, and a rear first storey walkout.
70 m away · filed Jan 28, 2026 · Approved
701 Sammon Ave · Minor variance
To alter the existing two-storey semi-detached dwelling (houseplex) by enclosing the front porch into habitable space, and to construct a front basement walkout, a rear two-storey addition, as well as a rear ground floor deck with stairs. There will be a total of two residential dwelling units on this lot (one unit occupying the basement level, and one unit occupying the first and second levels).
180 m away · filed Jan 21, 2026 · Approved
564 Milverton Blvd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition (mudroom) with stairs, in line with the existing rear one-storey partial addition.
230 m away · filed Jan 16, 2026 · Approved
279 Springdale Blvd · Minor variance
To legalize and to maintain the hard landscaping (pavers) in the front yard of the existing two-storey detached dwelling, which were constructed without the benefit of an authorized building permit.
200 m away · filed Jan 16, 2026 · Postponed
183 Glebemount Ave · Minor variance
To construct a new three-storey detached dwelling with a front covered porch with stairs, a front integral garage, a rear first storey walkout, and a rear second storey deck with stairs. There will be a total of two residential dwelling units on this lot (one unit occupying the first level, and one unit on the second and third levels).
80 m away · filed May 16, 2025 · Approved
274 Queensdale Ave · Minor variance
To permit the existing enclosed front porch that was converted into habitable space of the two-storey detached dwelling.
100 m away · filed Mar 13, 2025 · Approved
662 Mortimer Ave · Minor variance
To construct a new two-storey detached dwelling (including a partial rear one-storey portion at the northwest corner of the dwelling), a front covered porch, a rear ground floor deck, and front and rear second storey balconies. Also, to construct a parking pad, in the rear yard, abutting the laneway.
250 m away · filed Jan 17, 2023 · Approved
610 Mortimer Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a front porch, and a rear ground floor deck. Also, to reconstruct the rear ancillary building (detached garage), in the rear yard, abutting the laneway.
210 m away · filed Dec 2, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.