Toronto address · Ward 14, Toronto-Danforth
156 Gough Ave
The City of Toronto has 4 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Small residential project · Addition(s)
Alter plans approved under B.P.#04-110215 to add bathroom and closet on the 2nd floor.
Applied Jul 27, 2004 · issued Aug 6, 2004 · Permit 04 110215 BLD (revision 01)
- Permit issued
Heating and ventilation
Alter plans approved under permit #04-110215 to reclocate furnace in the basement.
Applied Jul 27, 2004 · issued Aug 16, 2004 · Permit 04 110215 HVA (revision 01)
- Closed (dormant)
Heating and ventilation
HVAC - Construct rear two storey addition. - Addition(s)
Applied Jul 12, 2004 · issued Jul 26, 2004 · completed Jun 8, 2026 · Permit 04 110215 HVA
- Inspections under way
Small residential project · Addition(s)
Construct rear two storey addition.
Applied Feb 18, 2004 · issued Apr 21, 2004 · Permit 04 110215 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
49 storeys · 496 homes · Mixed use
330 m away · Site plan · Under review · filed Aug 3, 2022
Neighbours’ Committee of Adjustment files within 250 m
49 Muriel Ave · Minor variance
To construct a new front yard parking pad, abutting Muriel Avenue.
220 m away · filed Oct 10, 2025 · Refused
111 Gough Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (with basement below), a third storey addition, a side (south) basement walkout, a rear ground floor covered deck with stairs, and front and rear third storey balconies There will be a total of two dwelling units on the lot (one secondary suite in the basement).
150 m away · filed Jul 25, 2025 · Deferred
157 Browning Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition, a front new canopy above the existing porch, and a rear three-storey addition with a deck and stairs.
250 m away · filed May 30, 2025 · Approved
13 Cruikshank Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing an east side three-storey addition, a front covered porch, and a rear deck with stairs. Also, to permit a front yard parking pad and to construct a rear one-storey ancillary building (shed). The existing rear one-storey ancillary building (three-car garage) will be demolished.
90 m away · filed Mar 10, 2025 · Approved
234 Browning Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a partial front one-storey addition (solarium). Also, to construct a one-storey ancillary building (detached garage), in the front yard.
210 m away · filed Jul 24, 2024 · Approved
878 Carlaw Ave · Consent
Section 57(1) of the Planning Act allows the assignment of authority to the Secretary-Treasurer, Committee of Adjustment or his/her designate to approve a Validation of Title.
100 m away · filed Jun 12, 2024 · Approved
889 Carlaw Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a rear balcony.
70 m away · filed Dec 13, 2023 · Approved
143 Gough Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a front juliet balcony, and a rooftop patio.
60 m away · filed Sep 11, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.