Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

156 Morse St

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    To install 1 Back Water Valve (Sewer only).

    Applied Jun 5, 2017 · issued Jun 5, 2017 · completed Sep 11, 2025 · Permit 17 173522 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 929 Queen St E · Minor variance

    To alter the development standards for the 9-storey mixed-use building (35 m in height to the top of the mechanical penthouse) containing commercial uses on the ground and mezzanine floors with side (west) second-floor terraces and a side (east) rooftop amenity terrace (approved under Site Specific Zoning By-Law 291-2024), by increasing the metric height of the first, second, sixth, and eighth storeys (by 0.7 m, 2.45 m, 0.5 m, and 0.4 m respectively), with a maximum building height of 35 m to the top of the ninth storey (excluding the mechanical penthouse). Also, to increase the total gross f…

    120 m away · filed Apr 15, 2026 · Approved

  • 140 Carlaw Ave · Minor variance

    To alter the existing two-storey townhouse by reconstructing and enclosing the existing front porch with stairs.

    130 m away · filed Feb 24, 2026 · Application withdrawn

  • 132 Morse St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a rooftop deck above.

    80 m away · filed Oct 3, 2024 · Approved

  • 972 Queen St E · Minor variance

    To convert the existing three-storey mixed-use building (972 Queen Street East) (containing one commercial ground floor unit and one vacant residential unit on the second and third floors) and rear two-storey ancillary building (181A Carlaw Avenue) (containing one ground floor vacant commercial unit and one vacant residential unit on the second floor) into a commercial use. There will be no residential dwelling units on the lot and no parking spaces on-site provided.

    210 m away · filed May 29, 2024 · Approved

  • 173 Logan Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addittion with a front third storey shed dormer and rear third storey balcony.

    120 m away · filed Jun 6, 2023 · Approved

  • 118 Booth Ave · Minor variance

    To convert the existing two-storey semi-detached dwelling from three-units into two-units by constructing a rear second storey addition, front ground floor stairs and to enclose the front porch.

    220 m away · filed Dec 21, 2022 · Approved

  • 163 Booth Ave · Minor variance

    To construct a new three-storey detached dwelling with a sunken front walkout, a rear lower courtyard, and a second storey rear deck. Also, to permit the construction of a two-storey ancillary building (laneway suite), currently under a separate building permit, in the rear yard, abutting the laneway.

    150 m away · filed Jul 8, 2022 · Approved

  • 980 Queen St E · Minor variance

    To convert the existing two-storey mixed-use building (containing a commercial use on the ground level and one dwelling unit on the second level) into a two-storey mixed-use building (containing two commercial units on the ground level and an office use on the second level) by constructing a second storey rear addition.

    220 m away · filed Jan 4, 2022 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.