Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

156 Welland Ave

The City of Toronto has 3 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Deck

    Construction of new rear yard wood deck with stairs at three stairs and glass-metal railing.

    Applied Apr 17, 2025 · issued May 5, 2025 · completed Jun 3, 2025 · Permit 25 146361 BLD

    Closed
  • Drains and site services · Back water valve (Sewer only)

    Proposed backwater valve install

    Applied Jan 13, 2025 · issued Jan 14, 2025 · completed Jan 17, 2025 · Permit 25 104160 DRN

    Closed
  • Small residential project · Multiple projects

    Interior alteration to remove load bearing walls and partion wall and then install 2 steel beams and one LVL beam with associated posts within the main floor. Also adding existing porch to the interior area and constructing the related concrete footings to support exterior wall.

    Applied Aug 16, 2024 · issued Aug 23, 2024 · completed Jun 3, 2025 · Permit 24 199247 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 210 Moore Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by extending the rear first level deck.

    160 m away · filed Sep 6, 2024 · Approved

  • 193 Hudson Dr · Minor variance

    To alter the existing three-storey detached dwelling by constructing a rear ground floor deck (to replace a portion of the existing deck).

    130 m away · filed Jul 12, 2024 · Approved

  • 189 Hudson Dr · Minor variance

    To construct a new two-storey detached dwelling with a front cantilevered second storey, a front integral garage, a front covered porch, and a rear basement walkout. The existing rear upper and lower decks in the rear yard, will be maintained and unaltered.

    120 m away · filed May 21, 2024 · Approved

  • 164 Hudson Dr · Minor variance

    To construct a new three-storey detached dwelling with an integral garage, a covered front porch, and a rear ground floor deck.

    160 m away · filed Aug 29, 2022 · Approved

  • 115 Welland Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a one-storey front addition (to enclose the existing covered front porch).

    180 m away · filed Jun 20, 2022 · Approved

  • 283 Heath St E · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey balcony. Also, to permit a deficiency of one parking space.

    130 m away · filed Apr 8, 2022 · Approved

  • 208 Moore Ave · Minor variance

    To construct a rear ground floor deck.

    170 m away · filed Feb 25, 2022 · Approved

  • 107 Moore Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a ground floor deck, a front two-storey addition and a front second storey addition above the existing porch.

    230 m away · filed Sep 7, 2021 · Approved

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.