Toronto address · Ward 19, Beaches-East York
157 Maclean Ave
The City of Toronto has 4 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Two storey rear addition, interior alterations, pergola and detached rear garage.
Applied Mar 13, 2024 · issued Mar 21, 2024 · completed Sep 17, 2025 · Permit 23 199922 HVA
- Revision issued
Small residential project · Multiple projects
Revision - shoring added to the north side of the addition
Applied Feb 2, 2024 · issued Feb 12, 2024 · Permit 23 199922 BLD (revision 01)
- Inspections under way
Small residential project · Multiple projects
Two storey rear addition, interior alterations, pergola and detached rear garage.
Applied Sep 8, 2023 · issued Sep 26, 2023 · Permit 23 199922 BLD
- Closed
Plumbing
Plumbing - Two storey rear addition, interior alterations, pergola and detached rear garage.
Applied Sep 8, 2023 · issued Sep 26, 2023 · completed Sep 17, 2025 · Permit 23 199922 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing two-storey detached dwelling by constructing rear one-storey and two-storey additions, a front porch with stairs, and a rear yard pergola. Also, to construct a one-storey ancillary building (detached garage) in the rear yard.
Decision: Approved (hearing Feb 15, 2023)
Filed Nov 4, 2022 · File A1212/22TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
52 Balsam Ave · Minor variance
To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.
240 m away · filed Feb 3, 2026 · Postponed
52 Balsam Ave · Minor variance
To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.
240 m away · filed Feb 3, 2026 · Postponed
52 Balsam Ave · Consent
To obtain consent to sever the property into two residential lots.
240 m away · filed Feb 3, 2026 · Postponed
97 Spruce Hill Rd · Minor variance
To construct a new two-storey ancillary building (containing a one-car garage, and one laneway suite), in the rear yard, abutting the laneway. The existing shed will be demolished.
220 m away · filed May 6, 2024 · Approved
155 Maclean Ave · Minor variance
To construct a new one-and-one-half-storey ancillary building (detached garage) in the rear yard. The existing semi-detached ancillary building (garage) will be demolished.
10 m away · filed Sep 8, 2023 · Approved
20 Crown Park Rd · Minor variance
To alter the existing three-storey detached dwelling by constructing second and third storey additions and a new covered porch (flanking the side and rear). Also, to construct an ancillary structure (covered lounge) and an in-ground swimming pool in the rear yard.
60 m away · filed Nov 18, 2022 · Approved
65 Pine Cres · Minor variance
To alter the existing two-storey detached dwelling by constructing a front second storey addition to replace the existing second storey balcony above the front porch.
220 m away · filed Jul 15, 2022 · Approved
22 Duart Park Rd · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second and third storey addition, front and rear balconies on the second and third floor, and a rear ground floor deck.
150 m away · filed Jun 16, 2022 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.