Toronto address · Ward 11, University-Rosedale
157 Roxborough St E
The City of Toronto has 2 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Party wall admin permits
Part Wall Admin permit related to underpinning at 155 Roxborough St E 20 100763 BLD 00 SR
Applied Jan 3, 2020 · issued Jan 14, 2020 · completed May 22, 2020 · Permit 20 100769 BLD
- Inspections under way
Small residential project · Addition(s)
Proposal to construct a rear one storey addition on existing foundation.
Applied Sep 19, 2019 · issued Sep 27, 2019 · Permit 19 224136 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing 2½-storey semi-detached dwelling by constructing a rear one-storey addition.
Decision: Approved (hearing Jun 26, 2019)
Filed Feb 27, 2019 · File A0206/19TEY
What’s planned nearby
Development sites within 500 m
- Approved
- Approved
Neighbours’ Committee of Adjustment files within 250 m
77 Chestnut Pk · Minor variance
To construct a new one-and-one-half-storey detached ancillary building (containing storage space within the basement level, a one-car garage and cabana on a portion of the main level, and one garden suite occupying the remaining main level as well as the second level). There will be a total of two residential dwelling units on this lot (one unit in the main dwelling and one in the ancillary building).
110 m away · filed Jul 14, 2026 · Hearing scheduled
36 South Dr · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a three-storey rear addition with a new dormer on the third level. There will be a rear ground level patio, and a third level balcony on the south side.
250 m away · filed Aug 29, 2025 · Approved
77 Chestnut Pk · Minor variance
To alter the existing three-storey detached dwelling by constructing a rear two-storey addition.
110 m away · filed Aug 19, 2025 · Approved
90 Roxborough St E · Minor variance
To construct a one-storey ancillary building (gazebo) in the rear yard of the property. The existing three-storey detached dwelling, and the rear one-storey ancillary building (garage) will be maintained and unaltered.
150 m away · filed Apr 14, 2025 · Approved
78 Crescent Rd · Minor variance
To alter the existing three-storey detached dwelling by enclosing the existing third storey (west side) deck. Also, to construct a new rear third storey deck. There are three residential dwelling units on this site.
230 m away · filed Mar 18, 2025 · Deferred
147 Roxborough St E · Minor variance
To alter the existing four-storey semi-detached dwelling by constructing an extension to the existing rear deck.
50 m away · filed Dec 3, 2024 · Approved
141 Roxborough St E · Minor variance
To alter the existing three-storey townhouse by constructing a rear ground floor deck with stairs, a rear second storey addition with a balcony (above the existing rear one-storey), and a rear third storey addition with a juliet balcony (above the existing second storey addition).
70 m away · filed Sep 5, 2024 · Approved
85 Crescent Rd · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear three-storey addition, with a rear covered ground floor terrace, and a rear third storey balcony.
220 m away · filed Nov 23, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.