Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

16 Belsize Dr

The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Party wall admin permits

    Admin Party Wall for the shared wall between 18 Belsize Dr and 16 Belsize Dr (semi-detached). Scope of work: For required waterproofing, parapet wall, fire protection, and sound Protection. No underpinning included, and no additional floor loads will be transferred to the party wall.

    Applied Jun 19, 2025 · issued Jul 16, 2025 · Permit 25 180315 BLD

    Permit issued

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 26 Carey Rd · Minor variance

    To construct a new undersized front yard parking pad, abutting Carey Road. The existing three-storey detached dwelling on the lot will be maintained and unaltered.

    210 m away · filed Dec 4, 2025 · Refused

  • 1951 Yonge St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-Law 907-2024(OLT)) for mixed-use buildings, by reducing the minimum number of parking spaces required.

    170 m away · filed Mar 17, 2025 · Approved

  • 11 Tullis Dr · Minor variance

    To construct a new three-storey detached dwelling with a front covered porch, a rear basement walkout, a rear ground floor deck, a rear second storey balcony with an exterior staircase, and a rear third storey rooftop terrace. This dwelling will have three residential units (triplex). Also, to construct a one-storey ancillary building (detached garage) in the rear yard.

    170 m away · filed Feb 8, 2024 · Approved

  • 10 Cuthbert Cres · Consent

    To obtain consent to sever an existing residential lot into two residential lots.

    220 m away · filed Jun 22, 2022 · Approved

  • 10 Cuthbert Cres · Minor variance

    To construct a new three-storey semi-detached dwelling with a front porch, a rear deck, a pergola, a shed and a sauna in the rear yard, front and rear basement walkouts, a front third storey balcony, and a parking pad in the front yard on the retained lot, described in the Consent Application B0049/22TEY.

    220 m away · filed Jun 22, 2022 · Approved

  • 10 Cuthbert Cres · Minor variance

    To construct a new three-storey semi-detached dwelling with a front porch, a rear deck, a pergola, a shed and a sauna in the rear yard, front and rear basement walkouts, a front third storey balcony, and a parking pad in the front yard on the conveyed lot, described in the Consent Application B0049/22TEY.

    220 m away · filed Jun 22, 2022 · Approved

  • 11 Glebe Rd E · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front integral garage and covered porch, a rear two-storey addition with a ground floor deck, and a partial third storey addition with a rear balcony.

    50 m away · filed Mar 8, 2022 · Approved

  • 1913 Yonge St · Minor variance

    To legalize and to maintain the shed that has been constructed between the two-storey building and the detached garage, without the benefit of a building permit.

    230 m away · filed Feb 24, 2022 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.