Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 1, Etobicoke North

16 Burtonwood Cres

The City of Toronto has 6 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • New house · New building

    Proposal for a two-storey detached dwelling with integral garage and basement secondary suite.

    Applied Apr 4, 2025 · issued Jun 2, 2025 · 1 home added · Permit 25 139657 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for a two-storey detached dwelling with integral garage and basement secondary suite.

    Applied Apr 4, 2025 · issued Jun 2, 2025 · Permit 25 139657 HVA

    Permit issued
  • Demolition

    Proposal to demolish the existing building.

    Applied Apr 4, 2025 · issued Jun 2, 2025 · 1 home removed · Permit 25 140003 DEM

    Permit issued
  • Drains and site services

    Drain - Proposal for a two-storey detached dwelling with integral garage and basement secondary suite.

    Applied Apr 4, 2025 · issued Jun 2, 2025 · Permit 25 139657 DRN

    Permit issued
  • Plumbing

    Plumbing - Proposal for a two-storey detached dwelling with integral garage and basement secondary suite.

    Applied Apr 4, 2025 · issued Jun 2, 2025 · Permit 25 139657 PLB

    Permit issued
  • Small residential project · Interior alterations

    As-built basement apartment, and as-suilt below grade entrance in rear yard in a one storey split level detached house

    Applied Feb 24, 2021 · completed Jan 10, 2022 · 1 home added · Permit 21 119801 BLD

    Cancelled

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new detached dwelling with an attached garage and a secondary suite.

    Decision: Approved (hearing Jan 16, 2025)

    Filed Sep 17, 2024 · File A0388/24EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 10 Netherly Dr · Minor variance

    To legalize and to maintain the as built detached dwelling with an attached garage.

    110 m away · filed Oct 12, 2023 · Approved

  • 4 Dorward Dr · Minor variance

    To construct a second storey addition above the existing dwelling and a new front porch.

    140 m away · filed Dec 19, 2022 · Approved

  • 10 Netherly Dr · Minor variance

    To construct a new detached dwelling with an attached garage.

    110 m away · filed Nov 1, 2022 · Approved

  • 131 Silverstone Dr · Minor variance

    To construct a new dwelling with an attached garage.

    160 m away · filed Apr 29, 2022 · Approved

  • 33 Blackbush Dr · Minor variance

    To construct a two-storey north side addition which will include a new attached garage and a second storey addition above the existing dwelling.

    140 m away · filed Feb 5, 2021 · Approved

  • 18 Netherly Dr · Minor variance

    To construct a second storey addition above the existing dwelling, a two-storey north side addition with attached garage and covered front and rear porches.

    90 m away · filed Oct 21, 2020 · Approved

Everything planned in Etobicoke North

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.