Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 16, Don Valley East

16 Cedarbank Cres

The City of Toronto has 4 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Revision 01 - No changes to the drawings; Energy Efficiency Design form updated.Proposal for 1 storey rear addition and interior alterations

    Applied Mar 15, 2021 · issued Mar 30, 2021 · Permit 20 234464 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Proposal for 1 storey rear addition and interior alterations

    Applied Feb 22, 2021 · issued Mar 30, 2021 · Permit 20 234464 HVA

    Revocation pending
  • Small residential project · Multiple projects

    Proposal for 1 storey rear addition and interior alterations

    Applied Dec 29, 2020 · issued Feb 2, 2021 · Permit 20 234464 BLD

    Permit issued
  • Plumbing

    Plumbing - Proposal for 1 storey rear addition and interior alterations

    Applied Dec 29, 2020 · issued Feb 2, 2021 · Permit 20 234464 PLB

    Revocation pending

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To permit a secondary suite along with constructing a new rear yard deck and enclosed front yard garage.

    Decision: Approved (hearing Apr 28, 2021)

    Filed Feb 23, 2021 · File A0120/21NY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 52 Mallow Rd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a one storey south side addition.

    150 m away · filed Jul 30, 2026 · Approved

  • 17 Ashgrove Pl · Minor variance

    To alter the existing one-storey detached dwelling by constructing a one-storey front entrance addition, as well as an ancillary building (detached garage) in the rear yard.

    190 m away · filed May 28, 2026 · Approved

  • 43 Mallow Rd · Minor variance

    To alter the existing detached dwelling by constructing a new one-storey front addition a two-storey west side addition and a new front covered porch.

    220 m away · filed Sep 8, 2025 · Approved

  • 5 Ashgrove Pl · Minor variance

    Proposal to demolish existing dwelling and construct a new 2-storey dwelling with integral garage

    140 m away · filed Sep 12, 2022 · Approved

  • 27 Hollyhock Crt · Minor variance

    Proposal to construct a 2nd floor deck at the rear of an existing detached dwelling.

    210 m away · filed Mar 28, 2022 · Approved

  • 42 Cedarbank Cres · Minor variance

    Proposal for a new dwelling.

    170 m away · filed Mar 17, 2022 · Approved

  • 32 Cedarbank Cres · Minor variance

    To construct a new dwelling.

    130 m away · filed Oct 14, 2020 · Approved

  • 14 Cedarbank Cres · Minor variance

    To construct a new front yard platform, canopy and walkway.

    10 m away · filed Sep 16, 2019 · Approved

Everything planned in Don Valley East

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.