16 Woodlawn Ave W

The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Construct a three storey dwelling with finished basement, front porch, rear deck and third floor balcony.

    Applied Sep 6, 2022 · issued Sep 13, 2022 · completed Jan 10, 2024 · Permit 21 251736 HVA

    Closed
  • Plumbing

    Plumbing - Construct a three storey dwelling rear deck

    Applied Dec 28, 2021 · issued Feb 11, 2022 · completed Jan 10, 2024 · Permit 21 251736 PLB

    Closed
  • New house · New building

    Construct a three storey dwelling with finished basement, front porch, rear deck and third floor balcony.

    Applied Dec 28, 2021 · issued Feb 11, 2022 · completed Aug 21, 2025 · 1 home added · Permit 21 251736 BLD

    Closed
  • Demolition

    Demolish existing three storey dwelling

    Applied Dec 28, 2021 · issued Feb 11, 2022 · completed Jan 18, 2024 · 1 home removed · Permit 21 251757 DEM

    Closed
  • Drains and site services

    Drain - Construct a three storey dwelling rear deck

    Applied Dec 28, 2021 · issued Feb 11, 2022 · completed Jan 10, 2024 · Permit 21 251736 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new dwelling.

    Decision: Approved (hearing Jul 22, 2021)

    Filed Mar 9, 2021 · File A0290/21TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 1251-1311 Yonge Street

    47 storeys · 832 homes · Mixed use

    80 m away · Site plan · Under review · filed Apr 12, 2022

    Under review
  • 9 Woodlawn Avenue East and 1233 Yonge Street

    49 storeys · 724 homes · Mixed use

    120 m away · Site plan · Under review · filed Dec 29, 2021

    Under review
  • 1366 Yonge Street

    41 storeys · 489 homes · Mixed use

    210 m away · Site plan · Under review · filed Sep 2, 2022

    Under review
  • 49 Jackes Avenue

    217 homes · Residential

    250 m away · Condominium · Under review · filed Nov 4, 2021

    Under review
  • 1212-1220 Yonge Street

    22 storeys · 185 homes · Mixed use

    280 m away · Site plan · Under review · filed Aug 31, 2022

    Under review
  • 1196-1210 Yonge Street

    14 storeys · 67 homes · Mixed use

    300 m away · Condominium · Under review · filed Nov 18, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 1262 Yonge St · Minor variance

    To permit an eating establishment use (restaurant) that is occupying the ground floor area of the existing three-storey mixed-use building. The existing two residential dwelling units (occupying the second and third levels) will be maintained and unaltered.

    100 m away · filed Apr 23, 2026 · Approved

  • 38 Walker Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear deck, a rear ground level deck with stairs, and a new front porch with stairs. The existing rear one-storey detached ancillary building (storage area) will be maintained and unaltered.

    180 m away · filed Jan 2, 2026 · Approved

  • 1177 Yonge St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 286-83) for the seven-storey mixed-use condominium building, by reducing the number of parking spaces required off-site. The existing on-site underground parking spaces on Parking Levels P1, P2, and P3 will be maintained and unaltered. There will be a total of 182 parking spaces provided on-site, therefore, there is no longer a need to lease parking spaces from the Toronto Transit Commission (TTC) site in Area "D".

    220 m away · filed Sep 2, 2025 · Approved

  • 48 Woodlawn Ave W · Minor variance

    To alter the existing two-storey detached dwelling by converting the rear second storey balcony and cantilevered addition into habitable space. The additional rear second storey balcony will be maintained.

    120 m away · filed Sep 10, 2024 · Approved

  • 37 Woodlawn Ave W · Minor variance

    To alter the existing three-storey semi-detached dwelling by constructing a front third storey dormer addition, and rear third storey Juliet balconies. The existing rear ground floor deck will also be extended towards the rear (south) lot line.

    100 m away · filed Feb 12, 2024 · Approved

  • 60 Woodlawn Ave W · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a third storey addition.

    130 m away · filed Sep 19, 2022 · Approved

  • 26 Summerhill Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition, and a new front porch. The existing one-storey rear addition will be demolished.

    210 m away · filed May 24, 2022 · Approved

  • 72 Farnham Ave · Minor variance

    To permit the front porch and staircase as well as a front yard parking pad.

    250 m away · filed Feb 24, 2022 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.