Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

160 John St

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Construct second storey addition with basement underpinning, basement walkout, new front porch and interior alterations.

    Applied Nov 23, 2016 · issued May 1, 2017 · completed May 23, 2017 · Permit 16 255107 HVA

    Closed
  • Plumbing

    Plumbing - Construct second storey addition with basement underpinning, basement walkout, new front porch and interior alterations.

    Applied Nov 23, 2016 · issued May 1, 2017 · completed May 23, 2017 · Permit 16 255107 PLB

    Closed
  • Small residential project · Multiple projects

    Construct second storey addition with basement underpinning, basement walkout, new front porch and interior alterations.

    Applied Nov 23, 2016 · issued May 1, 2017 · completed May 23, 2017 · Permit 16 255107 BLD

    Closed
  • Drains and site services

    Drain - Construct second storey addition with basement underpinning, basement walkout, new front porch and interior alterations.

    Applied Nov 23, 2016 · issued May 1, 2017 · completed May 24, 2017 · Permit 16 255107 DRN

    Closed
  • Plumbing · Other

    Proposal to replace piping throughout the house, replace 8 fixtures, install sump pit for weeper + sewage pit for 3 piece washroom..

    Applied Aug 8, 2016 · issued Aug 8, 2016 · completed May 23, 2017 · Permit 16 203293 PSA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 137-149 Church Street

    53 storeys · 463 homes · Mixed use

    260 m away · Site plan · Under review · filed Sep 21, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 29 William St · Minor variance

    To construct a two storey rear addition, a second storey addition above the existing dwelling, and an attached garage along the west side of the dwelling.

    250 m away · filed Feb 28, 2025 · Deferred

  • 105 John St · Minor variance

    To construct a two-storey rear addition and to enclose an existing front porch.

    180 m away · filed Sep 6, 2023 · Approved

  • 46 William St · Minor variance

    To construct a second storey addition above the existing dwelling, a two-storey rear addition and a new two-storey ancillary building in the rear yard which contains a garage located on the first storey and a garden suite located on the second storey.

    200 m away · filed May 3, 2023 · Approved

  • 127 King St · Minor variance

    To legalize and to maintain the partially built detached garage in the rear yard.

    220 m away · filed Mar 6, 2023 · Approved

  • 92 John St · Minor variance

    To construct a second storey addition, a side entry at west elevation and a front balcony.

    230 m away · filed Jan 25, 2023 · Approved

  • 45 William St · Minor variance

    To construct a garden suite in the rear yard.

    220 m away · filed Jan 13, 2023 · Refused

  • 119 King St · Minor variance

    To construct a one-storey addition above the existing dwelling and a two-storey rear addition and a new rear yard detached garage.

    250 m away · filed Jun 27, 2022 · Approved

  • 122 William St · Minor variance

    To maintain two secondary suites within the existing dwelling.

    150 m away · filed May 24, 2018 · Approved

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.