Toronto address · Ward 5, York South-Weston
160 King St
The City of Toronto has 5 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
Rev. #2: Removing windows, new windows, and sink.Rev. #1: Changes to exterior rear door/window sizes, adding brick to replace stucco finishProposal for basement and main floor interior alterations, second-storey addition. new porch, new deck, replace garage to existing SFD-D dwelling.
Applied Nov 20, 2019 · issued Dec 2, 2019 · Permit 18 148039 BLD (revision 02)
- Revision issued
Small residential project · Multiple projects
Rev. #1: Changes to exterior rear door/window sizes, adding brick to replace stucco finishProposal for basement and main floor interior alterations, second-storey addition. new porch, new deck, replace garage to existing SFD-D dwelling.
Applied Sep 27, 2018 · issued Nov 21, 2018 · Permit 18 148039 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal for basement and main floor interior alterations, second-storey addition. new porch, new deck, replace garage to existing SFD-D dwelling.
Applied Sep 26, 2018 · issued Oct 19, 2018 · completed Oct 27, 2021 · Permit 18 148039 HVA
- Inspections under way
Plumbing
Plumbing - Proposal for basement and main floor interior alterations, second-storey addition. new porch, new deck, replace garage to existing SFD-D dwelling.
Applied Apr 24, 2018 · issued Jun 7, 2018 · Permit 18 148039 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal for basement and main floor interior alterations, second-storey addition. new porch, new deck, replace garage to existing SFD-D dwelling.
Applied Apr 24, 2018 · issued Jun 7, 2018 · Permit 18 148039 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a second storey addition above the existing dwelling, a new front porch, a rear deck and a new detached garage in the rear yard.
Decision: Approved (hearing Nov 9, 2017)
Filed Aug 24, 2017 · File A0754/17EYK
What’s planned nearby
Development sites within 500 m
- Under review
53 storeys · 463 homes · Mixed use
120 m away · Site plan · Under review · filed Sep 21, 2021
Neighbours’ Committee of Adjustment files within 250 m
174 Church St · Minor variance
To construct a new fourplex.
130 m away · filed Mar 12, 2026 · Approved
127 King St · Minor variance
To legalize and to maintain the partially built detached garage in the rear yard.
220 m away · filed Mar 6, 2023 · Approved
3 Farnsworth Dr · Minor variance
To construct a new one-storey attached garage on the north side of the existing dwelling.
220 m away · filed Dec 19, 2021 · Approved
156 Church St · Minor variance
To construct a new detached dwelling with an attached garage.
110 m away · filed Oct 11, 2019 · Approved
43 Pine St · Minor variance
To construct a new detached dwelling.
130 m away · filed Mar 12, 2019 · Approved
43 Pine St · Minor variance
To construct a one-storey front addition and a partial second storey addition.
130 m away · filed Jul 17, 2018 · Approved
139 King St · Minor variance
To alter the existing dwelling by constructing the following: a second storey addition above the existing dwelling, a two-storey front addition, a one-storey front addition to the existing garage, a new covered front porch and a second storey rear platform.
130 m away · filed Mar 20, 2018 · Approved
154 King St · Minor variance
To construct a two-storey addition along the east side whcih will include an integral garage.
30 m away · filed Mar 9, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.