Toronto address · Ward 23, Scarborough North
161 Commander Blvd
The City of Toronto has 80 building permits since 2017 (40 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Under review
Addition or alteration · Interior alterations
Proposed interior alterations to existing industrial cosmetic manufacturing/compounding facility, including modifications to the reflected ceiling plan (RCP), ceiling assemblies, and associated roof work. No change to the existing use or occupancy.
Applied Sep 17, 2026 · Permit 26 239200 BLD
- Not started
Heating and ventilation
HVAC - Proposed interior alterations to existing industrial cosmetic manufacturing/compounding facility, including modifications to the reflected ceiling plan (RCP), ceiling assemblies, and associated roof work. No change to the existing use or occupancy.
Applied Sep 17, 2026 · Permit 26 239200 HVA
- Closed
Plumbing · Backflow prevention devices (Water only)
To replace existing 4" premise isolation backflow preventer and install an additional 3" backflow preventer for premise isolation - Estee Lauder Cosmetics
Applied Oct 21, 2024 · issued Nov 15, 2024 · completed Nov 28, 2024 · Permit 24 228889 PSA
- Closed
Heating and ventilation
REV - HVAC - interior alterations to existing industrial building
Applied Jun 12, 2024 · issued Jun 26, 2024 · completed Jul 30, 2025 · Permit 22 114146 HVA (revision 05)
- Revision issued
Addition or alteration · Interior alterations
Revision 06 - revision to permit # 22 114146revisions have been made to reflect onsite construction. As well as theconstruction of the temporary maintenance shop replacing the currentcleaning room outlined in the original permit.
Applied Jun 12, 2024 · issued Aug 2, 2024 · Permit 22 114146 BLD (revision 06)
- Revision issued
Plumbing
REV Plumbing - interior alterations to existing industrial building
Applied Jun 12, 2024 · issued Jun 17, 2024 · Permit 22 114146 PLB (revision 04)
- Closed
Heating and ventilation
REV 04 - Revision to HVAC REVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs
Applied Apr 2, 2024 · issued Apr 18, 2024 · completed Jul 30, 2025 · Permit 22 114146 HVA (revision 04)
- Revision issued
Addition or alteration · Interior alterations
REVISION 05: INCLUDES UPDATED DRAWINGS TO MEZZANINE PLAN TO INDICATE FIRE RATING REQUIREMENTSREVISION 04: INCLUDES UPDATED OBC MATRIX TO INDICATE FIRE SEPARATE BETWEEN FLOORSREVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs
Applied Feb 13, 2024 · issued Mar 22, 2024 · Permit 22 114146 BLD (revision 05)
- Revision issued
Addition or alteration · Interior alterations
REVISION 04: INCLUDES UPDATED OBC MATRIX TO INDICATE FIRE SEPARATE BETWEEN FLOORSREVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs
Applied Jan 25, 2024 · issued Mar 14, 2024 · Permit 22 114146 BLD (revision 04)
- Closed
Drains and site services · Site service
Proposed addition of new exterior 6" sanitary line to the building
Applied Oct 23, 2023 · issued Nov 2, 2023 · completed Feb 14, 2024 · Permit 23 217519 STS
- Revision issued
Addition or alteration · Interior alterations
REVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs
Applied May 30, 2023 · issued Jun 26, 2023 · Permit 22 114146 BLD (revision 03)
- Revision issued
Plumbing
REVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs
Applied May 30, 2023 · issued Jun 16, 2023 · Permit 22 114146 PLB (revision 03)
Show 68 more permits
- Closed
Heating and ventilation
REVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs
Applied May 30, 2023 · issued Jun 16, 2023 · completed Jul 30, 2025 · Permit 22 114146 HVA (revision 03)
- Revision issued
Addition or alteration · Interior alterations
Revision 02: Details for elevator shaft, mechanical units platform on roof modified. mechanical and structural modified to suit scope of revision. Revision - addition of airlocks around the warehouse, minor changes to "pre weigh" room layout. mechanical structural, electrical modified to suit scope of revision.
Applied Apr 3, 2023 · issued May 8, 2023 · Permit 22 114146 BLD (revision 02)
- Closed
Heating and ventilation
Revision 02: Details for elevator shaft, mechanical units platform on roof modified. mechanical and structural modified to suit scope of revision. Revision to HVAC - addition of airlocks around the warehouse, minor changes to "pre weigh" room layout. mechanical structural, electrical modified to suit scope of revision.
Applied Apr 3, 2023 · issued Apr 28, 2023 · completed Jul 30, 2025 · Permit 22 114146 HVA (revision 02)
- Revision issued
Plumbing
Revision 02: Details for elevator shaft, mechanical units platform on roof modified. mechanical and structural modified to suit scope of revision. Revision to Plumbing - addition of airlocks around the warehouse, minor changes to "pre weigh" room layout. mechanical structural, electrical modified to suit scope of revision.
Applied Apr 3, 2023 · issued Apr 28, 2023 · Permit 22 114146 PLB (revision 02)
- Permit issued
Drains and site services · Site service
Proposed: installation of 6" underground storm drains has changed locations as shown on previous permit 19 210309 sts (estee lauder)
Applied Feb 7, 2023 · issued Mar 16, 2023 · Permit 23 111272 STS
- Revision issued
Plumbing
Revision to Plumbing - addition of airlocks around the warehouse, minor changes to "pre weigh" room layout. mechanical structural, electrical modified to suit scope of revision.
Applied Dec 7, 2022 · issued Feb 3, 2023 · Permit 22 114146 PLB (revision 01)
- Revision issued
Addition or alteration · Interior alterations
Revision - addition of airlocks around the warehouse, minor changes to "pre weigh" room layout. mechanical structural, electrical modified to suit scope of revision.
Applied Dec 7, 2022 · issued Mar 16, 2023 · Permit 22 114146 BLD (revision 01)
- Closed
Heating and ventilation
Revision to HVAC - addition of airlocks around the warehouse, minor changes to "pre weigh" room layout. mechanical structural, electrical modified to suit scope of revision.
Applied Dec 7, 2022 · issued Feb 3, 2023 · completed Jul 30, 2025 · Permit 22 114146 HVA (revision 01)
- Closed
Addition or alteration · Addition(s)
REV #1-RELOCATE BUILDING 5' WEST TO AVOID PIV'Sconstruct 2 storey addition at southwest side, Phase 3B
Applied Jul 12, 2022 · issued Aug 30, 2022 · completed Mar 4, 2025 · Permit 21 114255 BLD (revision 01)
- Closed
Plumbing
REV #1-RELOCATE BUILDING 5' WEST TO AVOID PIV'SPlumbing - construct 2 storey addition at southwest side, Phase 3B
Applied Jul 12, 2022 · issued Jul 22, 2022 · completed Mar 13, 2025 · Permit 21 114255 PLB (revision 01)
- Closed
Heating and ventilation
REV #1-RELOCATE BUILDING 5' WEST TO AVOID PIV'SHVAC - construct 2 storey addition at southwest side, Phase 3B
Applied Jul 12, 2022 · issued Jul 22, 2022 · completed Mar 14, 2025 · Permit 21 114255 HVA (revision 01)
- Inspections under way
Plumbing
Plumbing - interior alterations to existing industrial building
Applied Feb 14, 2022 · issued Apr 4, 2022 · Permit 22 114146 PLB
- Closed
Heating and ventilation
HVAC - interior alterations to existing industrial building
Applied Feb 14, 2022 · issued Apr 4, 2022 · completed Jul 30, 2025 · Permit 22 114146 HVA
- Inspections under way
Addition or alteration · Interior alterations
interior alterations to existing industrial building
Applied Feb 14, 2022 · issued Apr 4, 2022 · Permit 22 114146 BLD
- Closed
Fire and security upgrade · Electromagnetic locks
Revision 01. Delete 1 maglock from the approved previous permitProposal to install 6 maglocks for existing industrial
Applied Dec 28, 2021 · issued Feb 2, 2022 · completed Jul 16, 2024 · Permit 21 186403 FSU (revision 01)
- Closed
Heating and ventilation
HVAC - install exterior dust collector
Applied Nov 29, 2021 · issued Dec 24, 2021 · completed Jun 19, 2024 · Permit 21 242894 HVA
- Closed
Designated structure · Exterior tank & support
install exterior dust collector
Applied Nov 29, 2021 · issued Dec 24, 2021 · completed Mar 20, 2025 · Permit 21 242894 DST
- Closed
Fire and security upgrade · Electromagnetic locks
Proposal to install 6 maglocks for existing industrial
Applied Jul 19, 2021 · issued Aug 4, 2021 · completed Jul 16, 2024 · Permit 21 186403 FSU
- Closed
Fire and security upgrade · Electromagnetic locks
Install 4 maglocks
Applied Jun 2, 2021 · issued Jun 9, 2021 · completed Mar 11, 2022 · Permit 21 164226 FSU
- Closed
Heating and ventilation
HVAC - construct 2 storey addition at southwest side, Phase 3B
Applied Feb 8, 2021 · issued Jan 21, 2022 · completed Mar 14, 2025 · Permit 21 114255 HVA
- Closed
Addition or alteration · Addition(s)
construct 2 storey addition at southwest side, Phase 3B
Applied Feb 8, 2021 · issued Jan 21, 2022 · completed Mar 4, 2025 · Permit 21 114255 BLD
- Closed
Plumbing
Plumbing - construct 2 storey addition at southwest side, Phase 3B
Applied Feb 8, 2021 · issued Jan 21, 2022 · completed Mar 13, 2025 · Permit 21 114255 PLB
- Closed
Heating and ventilation
HVAC - interior alterations to ground floor production area in existing manufacturing plant "Estee Lauder"
Applied Jan 22, 2021 · issued Sep 15, 2021 · completed Nov 14, 2022 · Permit 21 107606 HVA
- Closed
Plumbing
Plumbing - interior alterations to ground floor production area in existing manufacturing plant "Estee Lauder"
Applied Jan 22, 2021 · issued Sep 9, 2021 · completed Nov 16, 2022 · Permit 21 107606 PLB
- Inspections under way
Addition or alteration · Interior alterations
interior alterations to ground floor production area in existing manufacturing plant "Estee Lauder" PHASE 3A
Applied Jan 22, 2021 · issued Sep 9, 2021 · Permit 21 107606 BLD
- Closed
Plumbing
Plumbing - ground floor drainage replacement
Applied Dec 10, 2020 · issued Jan 22, 2021 · completed Oct 19, 2021 · Permit 20 228031 PLB
- Closed
Addition or alteration · Interior alterations
ground floor drainage replacement
Applied Dec 10, 2020 · issued Jan 22, 2021 · completed Nov 17, 2021 · Permit 20 228031 BLD
- Closed
Plumbing
Plumbing - Proposal for interior alterations to ground and second levels of existing manufacturing plant "Estee Lauder" (667.63m2).
Applied Jan 16, 2020 · issued Jun 23, 2020 · completed Jan 7, 2022 · Permit 20 105394 PLB
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to ground and second levels of existing manufacturing plant "Estee Lauder" (667.63m2).
Applied Jan 16, 2020 · issued Jun 23, 2020 · completed Jul 5, 2023 · Permit 20 105394 HVA
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to ground and second levels of existing manufacturing plant "Estee Lauder" (667.63m2).New proposed interior construction of 2-nd floor expansion and new mechanical platform on the roof(E.O.)
Applied Jan 16, 2020 · issued Jun 23, 2020 · completed Oct 28, 2021 · Permit 20 105394 BLD
- Closed
Drains and site services · Inside and outside drains
Drain - Renovations/alterations to the following: Kettle Room #1, electrical rooms and airlocks, new tank area, new compactor area, new heavy-duty asphalt, interior new opening.
Applied Aug 22, 2019 · issued Dec 12, 2019 · completed Feb 18, 2022 · Permit 19 210309 STS
- Closed
Plumbing
Plumbing - Renovations/alterations to the following: Kettle Room #1, electrical rooms and airlocks, new tank area, new compactor area, new heavy-duty asphalt, interior new opening.
Applied Aug 22, 2019 · issued Dec 12, 2019 · completed Feb 18, 2022 · Permit 19 210309 PLB
- Closed
Heating and ventilation
HVAC - Renovations/alterations to the following: Kettle Room #1, electrical rooms and airlocks, new tank area, new compactor area, new heavy-duty asphalt, interior new opening.
Applied Aug 22, 2019 · issued Dec 12, 2019 · completed Apr 19, 2022 · Permit 19 210309 HVA
- Inspections under way
Addition or alteration · Multiple projects
Renovations/alterations to the following: Kettle Room #1, electrical rooms and airlocks, new tank area, new compactor area, new heavy-duty asphalt, interior new opening.
Applied Aug 22, 2019 · issued Dec 12, 2019 · Permit 19 210309 BLD
- Closed
Addition or alteration · Other
Revision 1: changes to the stairsDemolish existing stairs, construct new steps and landscaping
Applied May 6, 2017 · issued Jun 12, 2017 · completed Oct 29, 2024 · Permit 16 213580 BLD (revision 01)
- Closed
Heating and ventilation
Revision # 01 - To the HVAC layout in the existing industrial building.HVAC - interior alterations to Kettle Room 2
Applied Aug 29, 2016 · issued Sep 29, 2016 · completed Jan 13, 2026 · Permit 15 177334 HVA (revision 01)
- Closed
Addition or alteration · Other
Demolish existing stairs, construct new steps and landscaping
Applied Aug 26, 2016 · issued Nov 21, 2016 · completed Oct 29, 2024 · Permit 16 213580 BLD
- Closed
Designated structure · Exterior tank & support
new generator and concrete pad
Applied Jul 13, 2016 · issued Aug 9, 2016 · completed Mar 7, 2017 · Permit 16 189586 DST
- Revision issued
Addition or alteration · Interior alterations
REV 01 - to fire and life safety
Applied Apr 25, 2016 · issued May 19, 2016 · Permit 15 228623 BLD (revision 01)
- Inspections under way
Plumbing
Plumbing - Proposed production area emergency drainage and retention.
Applied Sep 25, 2015 · issued Apr 18, 2016 · Permit 15 228623 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposed production area emergency drainage and retention.
Applied Sep 25, 2015 · issued Oct 8, 2015 · Permit 15 228623 BLD
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations to Kettle Room 2, raised roof structure, structurally reinforcing existing Mezzanine floor, addition of structural braces, relocate sprinklers and hvac.
Applied Jun 19, 2015 · issued Oct 22, 2015 · Permit 15 177334 BLD
- Inspections under way
Plumbing
Plumbing - interior alterations to Kettle Room 2
Applied Jun 19, 2015 · issued Oct 22, 2015 · Permit 15 177334 PLB
- Closed
Heating and ventilation
HVAC - interior alterations to Kettle Room 2
Applied Jun 19, 2015 · issued Oct 22, 2015 · completed Jan 13, 2026 · Permit 15 177334 HVA
- Closed
Plumbing
REV #01 - Revison to cleaning room renovationsPlumbing - Interior alteration to existing industrial space to construct cleaning room
Applied Jun 2, 2015 · issued Dec 3, 2015 · completed Aug 13, 2026 · Permit 14 125965 PLB (revision 01)
- Cancelled
Addition or alteration · Interior alterations
REV #01 - Revison to cleaning room renovationsInterior alteration to existing industrial space to construct cleaning room
Applied May 1, 2015 · completed Nov 5, 2024 · Permit 14 125965 BLD (revision 01)
- Revision issued
Heating and ventilation
REV #01 - Revison to cleaning room renovationsHVAC - Interior alteration to existing industrial space to construct cleaning room
Applied May 1, 2015 · issued Apr 28, 2023 · Permit 14 125965 HVA (revision 01)
- Permit issued
Addition or alteration · Interior alterations
Proposal for alteration to existing building, Estee Lauder cosmetics, for a REMSTAR unit.
Applied Jun 2, 2014 · issued Jun 17, 2014 · Permit 14 166017 BLD
- Inspections under way
Addition or alteration · Interior alterations
250.30m2 of Interior Alteraitons on existing mezzanine level
Applied Apr 22, 2014 · issued Aug 19, 2014 · Permit 14 145161 BLD
- Closed
Plumbing
Plumbing - Interior alteration to existing industrial space to construct cleaning room
Applied Mar 7, 2014 · issued May 19, 2015 · completed Aug 13, 2026 · Permit 14 125965 PLB
- Inspections under way
Heating and ventilation
HVAC - Interior alteration to existing industrial space to construct cleaning room
Applied Mar 7, 2014 · issued Apr 24, 2015 · Permit 14 125965 HVA
- Permit issued
Addition or alteration · Interior alterations
Interior alteration to existing industrial space to construct cleaning room
Applied Mar 7, 2014 · issued Apr 24, 2015 · Permit 14 125965 BLD
- Revision issued
Addition or alteration · Interior alterations
REV. #1- revisions to office area - relocate partition walls to accomodate additional office, Removal of walls, relocate diffusers -no plumbing changesinterior alterations for ESTEE LAUDER OFFICES
Applied Oct 2, 2012 · issued Jan 29, 2013 · Permit 11 327097 BLD (revision 01)
- Revision issued
Heating and ventilation
REV. #1- relocate diffusers due to relocation of partition wallsHVAC - interior alterations for ESTEE LAUDER OFFICES
Applied Oct 2, 2012 · issued Jan 15, 2013 · Permit 11 327097 HVA (revision 01)
- Application on hold
Fire and security upgrade
FS - Sprinkler Shop Drawing - interior alterations for ESTEE LAUDER OFFICES
Applied Apr 27, 2012 · Permit 11 327097 FSU
- Inspections under way
Addition or alteration · Interior alterations
interior alterations for ESTEE LAUDER OFFICES
Applied Dec 16, 2011 · issued May 1, 2012 · Permit 11 327097 BLD
- Inspections under way
Heating and ventilation
HVAC - interior alterations for ESTEE LAUDER OFFICES
Applied Dec 16, 2011 · issued May 1, 2012 · Permit 11 327097 HVA
- Inspections under way
Plumbing
Plumbing - interior alterations for ESTEE LAUDER OFFICES
Applied Dec 16, 2011 · issued May 1, 2012 · Permit 11 327097 PLB
- Inspections under way
Plumbing
Plumbing - provide new washrooms and change rooms
Applied Dec 6, 2010 · issued Mar 15, 2011 · Permit 10 309272 PLB
- Inspections under way
Heating and ventilation
HVAC - provide new washrooms and change rooms
Applied Dec 6, 2010 · issued Mar 15, 2011 · Permit 10 309272 HVA
- Inspections under way
Addition or alteration · Interior alterations
provide new washrooms and change rooms
Applied Dec 6, 2010 · issued Feb 2, 2011 · Permit 10 309272 BLD
- Closed
Heating and ventilation
HVAC - Roof alteration to add skylight
Applied Oct 6, 2008 · issued Nov 14, 2008 · completed Nov 30, 2021 · Permit 08 210436 HVA
- Inspections under way
Plumbing
Plumbing - Addition of new cold storage room to existing building, new rooftop unit
Applied Jun 18, 2008 · issued Aug 1, 2008 · Permit 08 160596 PLB
- Inspections under way
Addition or alteration · Other
Concrete pad for new chiller and tanks
Applied Sep 21, 2006 · issued Oct 10, 2006 · Permit 06 174923 BLD
- Inspections under way
Plumbing
Plumbing - MASCARA LINE RENOVATION - Interior Alterations
Applied Mar 17, 2004 · issued May 13, 2004 · Permit 04 115291 PLB
- Inspections under way
Plumbing
Plumbing - SOLVENT STORAGE ROOM ADDITION, INTERIOR CORRIDOR AND LAB - Interior Alterations
Applied Mar 17, 2004 · issued Aug 26, 2004 · Permit 04 117313 PLB
- Closed
Heating and ventilation
HVAC - SOLVENT STORAGE ROOM ADDITION, INTERIOR CORRIDOR AND LAB - Interior Alterations
Applied Mar 17, 2004 · issued Aug 26, 2004 · completed Nov 30, 2021 · Permit 04 117313 HVA
- Closed
Heating and ventilation
HVAC - MASCARA LINE RENOVATION - Interior Alterations
Applied Mar 17, 2004 · issued May 13, 2004 · completed Nov 30, 2021 · Permit 04 115291 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
2266 Brimley Rd · Minor variance
The applicant is seeking relief from the provisions of the Zoning By-law to construct a second storey with a two storey rear addition to the existing single family dwelling.
230 m away · filed Dec 22, 2017 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.