Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 23, Scarborough North

161 Commander Blvd

The City of Toronto has 80 building permits since 2017 (40 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Proposed interior alterations to existing industrial cosmetic manufacturing/compounding facility, including modifications to the reflected ceiling plan (RCP), ceiling assemblies, and associated roof work. No change to the existing use or occupancy.

    Applied Sep 17, 2026 · Permit 26 239200 BLD

    Under review
  • Heating and ventilation

    HVAC - Proposed interior alterations to existing industrial cosmetic manufacturing/compounding facility, including modifications to the reflected ceiling plan (RCP), ceiling assemblies, and associated roof work. No change to the existing use or occupancy.

    Applied Sep 17, 2026 · Permit 26 239200 HVA

    Not started
  • Plumbing · Backflow prevention devices (Water only)

    To replace existing 4" premise isolation backflow preventer and install an additional 3" backflow preventer for premise isolation - Estee Lauder Cosmetics

    Applied Oct 21, 2024 · issued Nov 15, 2024 · completed Nov 28, 2024 · Permit 24 228889 PSA

    Closed
  • Heating and ventilation

    REV - HVAC - interior alterations to existing industrial building

    Applied Jun 12, 2024 · issued Jun 26, 2024 · completed Jul 30, 2025 · Permit 22 114146 HVA (revision 05)

    Closed
  • Addition or alteration · Interior alterations

    Revision 06 - revision to permit # 22 114146revisions have been made to reflect onsite construction. As well as theconstruction of the temporary maintenance shop replacing the currentcleaning room outlined in the original permit.

    Applied Jun 12, 2024 · issued Aug 2, 2024 · Permit 22 114146 BLD (revision 06)

    Revision issued
  • Plumbing

    REV Plumbing - interior alterations to existing industrial building

    Applied Jun 12, 2024 · issued Jun 17, 2024 · Permit 22 114146 PLB (revision 04)

    Revision issued
  • Heating and ventilation

    REV 04 - Revision to HVAC REVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs

    Applied Apr 2, 2024 · issued Apr 18, 2024 · completed Jul 30, 2025 · Permit 22 114146 HVA (revision 04)

    Closed
  • Addition or alteration · Interior alterations

    REVISION 05: INCLUDES UPDATED DRAWINGS TO MEZZANINE PLAN TO INDICATE FIRE RATING REQUIREMENTSREVISION 04: INCLUDES UPDATED OBC MATRIX TO INDICATE FIRE SEPARATE BETWEEN FLOORSREVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs

    Applied Feb 13, 2024 · issued Mar 22, 2024 · Permit 22 114146 BLD (revision 05)

    Revision issued
  • Addition or alteration · Interior alterations

    REVISION 04: INCLUDES UPDATED OBC MATRIX TO INDICATE FIRE SEPARATE BETWEEN FLOORSREVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs

    Applied Jan 25, 2024 · issued Mar 14, 2024 · Permit 22 114146 BLD (revision 04)

    Revision issued
  • Drains and site services · Site service

    Proposed addition of new exterior 6" sanitary line to the building

    Applied Oct 23, 2023 · issued Nov 2, 2023 · completed Feb 14, 2024 · Permit 23 217519 STS

    Closed
  • Addition or alteration · Interior alterations

    REVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs

    Applied May 30, 2023 · issued Jun 26, 2023 · Permit 22 114146 BLD (revision 03)

    Revision issued
  • Plumbing

    REVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs

    Applied May 30, 2023 · issued Jun 16, 2023 · Permit 22 114146 PLB (revision 03)

    Revision issued
Show 68 more permits
  • Heating and ventilation

    REVISION 3 - includes details to new washrooms and locker room layouts, new interior mezzanine stairs

    Applied May 30, 2023 · issued Jun 16, 2023 · completed Jul 30, 2025 · Permit 22 114146 HVA (revision 03)

    Closed
  • Addition or alteration · Interior alterations

    Revision 02: Details for elevator shaft, mechanical units platform on roof modified. mechanical and structural modified to suit scope of revision. Revision - addition of airlocks around the warehouse, minor changes to "pre weigh" room layout. mechanical structural, electrical modified to suit scope of revision.

    Applied Apr 3, 2023 · issued May 8, 2023 · Permit 22 114146 BLD (revision 02)

    Revision issued
  • Heating and ventilation

    Revision 02: Details for elevator shaft, mechanical units platform on roof modified. mechanical and structural modified to suit scope of revision. Revision to HVAC - addition of airlocks around the warehouse, minor changes to "pre weigh" room layout. mechanical structural, electrical modified to suit scope of revision.

    Applied Apr 3, 2023 · issued Apr 28, 2023 · completed Jul 30, 2025 · Permit 22 114146 HVA (revision 02)

    Closed
  • Plumbing

    Revision 02: Details for elevator shaft, mechanical units platform on roof modified. mechanical and structural modified to suit scope of revision. Revision to Plumbing - addition of airlocks around the warehouse, minor changes to "pre weigh" room layout. mechanical structural, electrical modified to suit scope of revision.

    Applied Apr 3, 2023 · issued Apr 28, 2023 · Permit 22 114146 PLB (revision 02)

    Revision issued
  • Drains and site services · Site service

    Proposed: installation of 6" underground storm drains has changed locations as shown on previous permit 19 210309 sts (estee lauder)

    Applied Feb 7, 2023 · issued Mar 16, 2023 · Permit 23 111272 STS

    Permit issued
  • Plumbing

    Revision to Plumbing - addition of airlocks around the warehouse, minor changes to "pre weigh" room layout. mechanical structural, electrical modified to suit scope of revision.

    Applied Dec 7, 2022 · issued Feb 3, 2023 · Permit 22 114146 PLB (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Revision - addition of airlocks around the warehouse, minor changes to "pre weigh" room layout. mechanical structural, electrical modified to suit scope of revision.

    Applied Dec 7, 2022 · issued Mar 16, 2023 · Permit 22 114146 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    Revision to HVAC - addition of airlocks around the warehouse, minor changes to "pre weigh" room layout. mechanical structural, electrical modified to suit scope of revision.

    Applied Dec 7, 2022 · issued Feb 3, 2023 · completed Jul 30, 2025 · Permit 22 114146 HVA (revision 01)

    Closed
  • Addition or alteration · Addition(s)

    REV #1-RELOCATE BUILDING 5' WEST TO AVOID PIV'Sconstruct 2 storey addition at southwest side, Phase 3B

    Applied Jul 12, 2022 · issued Aug 30, 2022 · completed Mar 4, 2025 · Permit 21 114255 BLD (revision 01)

    Closed
  • Plumbing

    REV #1-RELOCATE BUILDING 5' WEST TO AVOID PIV'SPlumbing - construct 2 storey addition at southwest side, Phase 3B

    Applied Jul 12, 2022 · issued Jul 22, 2022 · completed Mar 13, 2025 · Permit 21 114255 PLB (revision 01)

    Closed
  • Heating and ventilation

    REV #1-RELOCATE BUILDING 5' WEST TO AVOID PIV'SHVAC - construct 2 storey addition at southwest side, Phase 3B

    Applied Jul 12, 2022 · issued Jul 22, 2022 · completed Mar 14, 2025 · Permit 21 114255 HVA (revision 01)

    Closed
  • Plumbing

    Plumbing - interior alterations to existing industrial building

    Applied Feb 14, 2022 · issued Apr 4, 2022 · Permit 22 114146 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - interior alterations to existing industrial building

    Applied Feb 14, 2022 · issued Apr 4, 2022 · completed Jul 30, 2025 · Permit 22 114146 HVA

    Closed
  • Addition or alteration · Interior alterations

    interior alterations to existing industrial building

    Applied Feb 14, 2022 · issued Apr 4, 2022 · Permit 22 114146 BLD

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    Revision 01. Delete 1 maglock from the approved previous permitProposal to install 6 maglocks for existing industrial

    Applied Dec 28, 2021 · issued Feb 2, 2022 · completed Jul 16, 2024 · Permit 21 186403 FSU (revision 01)

    Closed
  • Heating and ventilation

    HVAC - install exterior dust collector

    Applied Nov 29, 2021 · issued Dec 24, 2021 · completed Jun 19, 2024 · Permit 21 242894 HVA

    Closed
  • Designated structure · Exterior tank & support

    install exterior dust collector

    Applied Nov 29, 2021 · issued Dec 24, 2021 · completed Mar 20, 2025 · Permit 21 242894 DST

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install 6 maglocks for existing industrial

    Applied Jul 19, 2021 · issued Aug 4, 2021 · completed Jul 16, 2024 · Permit 21 186403 FSU

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Install 4 maglocks

    Applied Jun 2, 2021 · issued Jun 9, 2021 · completed Mar 11, 2022 · Permit 21 164226 FSU

    Closed
  • Heating and ventilation

    HVAC - construct 2 storey addition at southwest side, Phase 3B

    Applied Feb 8, 2021 · issued Jan 21, 2022 · completed Mar 14, 2025 · Permit 21 114255 HVA

    Closed
  • Addition or alteration · Addition(s)

    construct 2 storey addition at southwest side, Phase 3B

    Applied Feb 8, 2021 · issued Jan 21, 2022 · completed Mar 4, 2025 · Permit 21 114255 BLD

    Closed
  • Plumbing

    Plumbing - construct 2 storey addition at southwest side, Phase 3B

    Applied Feb 8, 2021 · issued Jan 21, 2022 · completed Mar 13, 2025 · Permit 21 114255 PLB

    Closed
  • Heating and ventilation

    HVAC - interior alterations to ground floor production area in existing manufacturing plant "Estee Lauder"

    Applied Jan 22, 2021 · issued Sep 15, 2021 · completed Nov 14, 2022 · Permit 21 107606 HVA

    Closed
  • Plumbing

    Plumbing - interior alterations to ground floor production area in existing manufacturing plant "Estee Lauder"

    Applied Jan 22, 2021 · issued Sep 9, 2021 · completed Nov 16, 2022 · Permit 21 107606 PLB

    Closed
  • Addition or alteration · Interior alterations

    interior alterations to ground floor production area in existing manufacturing plant "Estee Lauder" PHASE 3A

    Applied Jan 22, 2021 · issued Sep 9, 2021 · Permit 21 107606 BLD

    Inspections under way
  • Plumbing

    Plumbing - ground floor drainage replacement

    Applied Dec 10, 2020 · issued Jan 22, 2021 · completed Oct 19, 2021 · Permit 20 228031 PLB

    Closed
  • Addition or alteration · Interior alterations

    ground floor drainage replacement

    Applied Dec 10, 2020 · issued Jan 22, 2021 · completed Nov 17, 2021 · Permit 20 228031 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to ground and second levels of existing manufacturing plant "Estee Lauder" (667.63m2).

    Applied Jan 16, 2020 · issued Jun 23, 2020 · completed Jan 7, 2022 · Permit 20 105394 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to ground and second levels of existing manufacturing plant "Estee Lauder" (667.63m2).

    Applied Jan 16, 2020 · issued Jun 23, 2020 · completed Jul 5, 2023 · Permit 20 105394 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to ground and second levels of existing manufacturing plant "Estee Lauder" (667.63m2).New proposed interior construction of 2-nd floor expansion and new mechanical platform on the roof(E.O.)

    Applied Jan 16, 2020 · issued Jun 23, 2020 · completed Oct 28, 2021 · Permit 20 105394 BLD

    Closed
  • Drains and site services · Inside and outside drains

    Drain - Renovations/alterations to the following: Kettle Room #1, electrical rooms and airlocks, new tank area, new compactor area, new heavy-duty asphalt, interior new opening.

    Applied Aug 22, 2019 · issued Dec 12, 2019 · completed Feb 18, 2022 · Permit 19 210309 STS

    Closed
  • Plumbing

    Plumbing - Renovations/alterations to the following: Kettle Room #1, electrical rooms and airlocks, new tank area, new compactor area, new heavy-duty asphalt, interior new opening.

    Applied Aug 22, 2019 · issued Dec 12, 2019 · completed Feb 18, 2022 · Permit 19 210309 PLB

    Closed
  • Heating and ventilation

    HVAC - Renovations/alterations to the following: Kettle Room #1, electrical rooms and airlocks, new tank area, new compactor area, new heavy-duty asphalt, interior new opening.

    Applied Aug 22, 2019 · issued Dec 12, 2019 · completed Apr 19, 2022 · Permit 19 210309 HVA

    Closed
  • Addition or alteration · Multiple projects

    Renovations/alterations to the following: Kettle Room #1, electrical rooms and airlocks, new tank area, new compactor area, new heavy-duty asphalt, interior new opening.

    Applied Aug 22, 2019 · issued Dec 12, 2019 · Permit 19 210309 BLD

    Inspections under way
  • Addition or alteration · Other

    Revision 1: changes to the stairsDemolish existing stairs, construct new steps and landscaping

    Applied May 6, 2017 · issued Jun 12, 2017 · completed Oct 29, 2024 · Permit 16 213580 BLD (revision 01)

    Closed
  • Heating and ventilation

    Revision # 01 - To the HVAC layout in the existing industrial building.HVAC - interior alterations to Kettle Room 2

    Applied Aug 29, 2016 · issued Sep 29, 2016 · completed Jan 13, 2026 · Permit 15 177334 HVA (revision 01)

    Closed
  • Addition or alteration · Other

    Demolish existing stairs, construct new steps and landscaping

    Applied Aug 26, 2016 · issued Nov 21, 2016 · completed Oct 29, 2024 · Permit 16 213580 BLD

    Closed
  • Designated structure · Exterior tank & support

    new generator and concrete pad

    Applied Jul 13, 2016 · issued Aug 9, 2016 · completed Mar 7, 2017 · Permit 16 189586 DST

    Closed
  • Addition or alteration · Interior alterations

    REV 01 - to fire and life safety

    Applied Apr 25, 2016 · issued May 19, 2016 · Permit 15 228623 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing - Proposed production area emergency drainage and retention.

    Applied Sep 25, 2015 · issued Apr 18, 2016 · Permit 15 228623 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposed production area emergency drainage and retention.

    Applied Sep 25, 2015 · issued Oct 8, 2015 · Permit 15 228623 BLD

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to Kettle Room 2, raised roof structure, structurally reinforcing existing Mezzanine floor, addition of structural braces, relocate sprinklers and hvac.

    Applied Jun 19, 2015 · issued Oct 22, 2015 · Permit 15 177334 BLD

    Inspections under way
  • Plumbing

    Plumbing - interior alterations to Kettle Room 2

    Applied Jun 19, 2015 · issued Oct 22, 2015 · Permit 15 177334 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - interior alterations to Kettle Room 2

    Applied Jun 19, 2015 · issued Oct 22, 2015 · completed Jan 13, 2026 · Permit 15 177334 HVA

    Closed
  • Plumbing

    REV #01 - Revison to cleaning room renovationsPlumbing - Interior alteration to existing industrial space to construct cleaning room

    Applied Jun 2, 2015 · issued Dec 3, 2015 · completed Aug 13, 2026 · Permit 14 125965 PLB (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    REV #01 - Revison to cleaning room renovationsInterior alteration to existing industrial space to construct cleaning room

    Applied May 1, 2015 · completed Nov 5, 2024 · Permit 14 125965 BLD (revision 01)

    Cancelled
  • Heating and ventilation

    REV #01 - Revison to cleaning room renovationsHVAC - Interior alteration to existing industrial space to construct cleaning room

    Applied May 1, 2015 · issued Apr 28, 2023 · Permit 14 125965 HVA (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Proposal for alteration to existing building, Estee Lauder cosmetics, for a REMSTAR unit.

    Applied Jun 2, 2014 · issued Jun 17, 2014 · Permit 14 166017 BLD

    Permit issued
  • Addition or alteration · Interior alterations

    250.30m2 of Interior Alteraitons on existing mezzanine level

    Applied Apr 22, 2014 · issued Aug 19, 2014 · Permit 14 145161 BLD

    Inspections under way
  • Plumbing

    Plumbing - Interior alteration to existing industrial space to construct cleaning room

    Applied Mar 7, 2014 · issued May 19, 2015 · completed Aug 13, 2026 · Permit 14 125965 PLB

    Closed
  • Heating and ventilation

    HVAC - Interior alteration to existing industrial space to construct cleaning room

    Applied Mar 7, 2014 · issued Apr 24, 2015 · Permit 14 125965 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alteration to existing industrial space to construct cleaning room

    Applied Mar 7, 2014 · issued Apr 24, 2015 · Permit 14 125965 BLD

    Permit issued
  • Addition or alteration · Interior alterations

    REV. #1- revisions to office area - relocate partition walls to accomodate additional office, Removal of walls, relocate diffusers -no plumbing changesinterior alterations for ESTEE LAUDER OFFICES

    Applied Oct 2, 2012 · issued Jan 29, 2013 · Permit 11 327097 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    REV. #1- relocate diffusers due to relocation of partition wallsHVAC - interior alterations for ESTEE LAUDER OFFICES

    Applied Oct 2, 2012 · issued Jan 15, 2013 · Permit 11 327097 HVA (revision 01)

    Revision issued
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - interior alterations for ESTEE LAUDER OFFICES

    Applied Apr 27, 2012 · Permit 11 327097 FSU

    Application on hold
  • Addition or alteration · Interior alterations

    interior alterations for ESTEE LAUDER OFFICES

    Applied Dec 16, 2011 · issued May 1, 2012 · Permit 11 327097 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - interior alterations for ESTEE LAUDER OFFICES

    Applied Dec 16, 2011 · issued May 1, 2012 · Permit 11 327097 HVA

    Inspections under way
  • Plumbing

    Plumbing - interior alterations for ESTEE LAUDER OFFICES

    Applied Dec 16, 2011 · issued May 1, 2012 · Permit 11 327097 PLB

    Inspections under way
  • Plumbing

    Plumbing - provide new washrooms and change rooms

    Applied Dec 6, 2010 · issued Mar 15, 2011 · Permit 10 309272 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - provide new washrooms and change rooms

    Applied Dec 6, 2010 · issued Mar 15, 2011 · Permit 10 309272 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    provide new washrooms and change rooms

    Applied Dec 6, 2010 · issued Feb 2, 2011 · Permit 10 309272 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Roof alteration to add skylight

    Applied Oct 6, 2008 · issued Nov 14, 2008 · completed Nov 30, 2021 · Permit 08 210436 HVA

    Closed
  • Plumbing

    Plumbing - Addition of new cold storage room to existing building, new rooftop unit

    Applied Jun 18, 2008 · issued Aug 1, 2008 · Permit 08 160596 PLB

    Inspections under way
  • Addition or alteration · Other

    Concrete pad for new chiller and tanks

    Applied Sep 21, 2006 · issued Oct 10, 2006 · Permit 06 174923 BLD

    Inspections under way
  • Plumbing

    Plumbing - MASCARA LINE RENOVATION - Interior Alterations

    Applied Mar 17, 2004 · issued May 13, 2004 · Permit 04 115291 PLB

    Inspections under way
  • Plumbing

    Plumbing - SOLVENT STORAGE ROOM ADDITION, INTERIOR CORRIDOR AND LAB - Interior Alterations

    Applied Mar 17, 2004 · issued Aug 26, 2004 · Permit 04 117313 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - SOLVENT STORAGE ROOM ADDITION, INTERIOR CORRIDOR AND LAB - Interior Alterations

    Applied Mar 17, 2004 · issued Aug 26, 2004 · completed Nov 30, 2021 · Permit 04 117313 HVA

    Closed
  • Heating and ventilation

    HVAC - MASCARA LINE RENOVATION - Interior Alterations

    Applied Mar 17, 2004 · issued May 13, 2004 · completed Nov 30, 2021 · Permit 04 115291 HVA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 2266 Brimley Rd · Minor variance

    The applicant is seeking relief from the provisions of the Zoning By-law to construct a second storey with a two storey rear addition to the existing single family dwelling.

    230 m away · filed Dec 22, 2017 · Refused

Everything planned in Scarborough North

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.