Toronto address · Ward 14, Toronto-Danforth
161 Durant Ave
The City of Toronto has 4 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing
Plumbing - Proposed side extension and second floor addition to an existing bungalow
Applied Feb 10, 2025 · issued Mar 6, 2025 · Permit 25 113008 PLB
- Closed
Drains and site services
Drain - Proposed side extension and second floor addition to an existing bungalow
Applied Feb 10, 2025 · issued Mar 6, 2025 · completed Sep 16, 2026 · Permit 25 113008 DRN
- Inspections under way
Small residential project · Addition(s)
Proposed side extension and second floor addition to an existing bungalow
Applied Feb 5, 2025 · issued Mar 6, 2025 · Permit 25 113008 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposed side extension and second floor addition to an existing bungalow
Applied Feb 5, 2025 · issued Apr 15, 2025 · Permit 25 113008 HVA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing one-storey detached dwelling by constructing a one-storey side (south) addition and a complete second storey addition. The existing rear sunroom addition will be demolished and replaced with a walkout basement staircase and a deck.
Decision: Approved (hearing Jan 15, 2025)
Filed Nov 4, 2024 · File A0955/24TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
40 Lankin Blvd · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second storey addition (the front and rear portions will be cantilevered), with a new partially covered front porch, and a second storey balcony on the west side.
180 m away · filed Jan 13, 2026 · Approved
46 Lankin Blvd · Minor variance
To construct a new two-storey detached dwelling with a front covered porch with stairs, a front integral garage, a rear first floor deck with stairs, and a rear basement walkout.
150 m away · filed Dec 19, 2025 · Approved
80 Lankin Blvd · Minor variance
To construct a new one-storey ancillary building (detached garage) in the rear yard, abutting Plains Road.
60 m away · filed Oct 8, 2024 · Approved
167 Durant Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition (sunroom), and a rear ground floor deck with stairs. Also, the front portion of the existing one-storey ancillary building (detached garage in the rear yard) will be demolished. This reduced one-car garage will be maintained on-site.
20 m away · filed May 3, 2024 · Approved
24 Northridge Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a new front covered porch with stairs, a front basement walkout, and a rear ground floor covered deck with stairs.
240 m away · filed Jan 12, 2024 · Approved
109 Lankin Blvd · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a rear two-storey addition, a new covered front porch, an integral garage with a new driveway, a rear ground floor deck with stairs, and a rear basement walkout. The existing front porch and the detached garage in the rear yard will be demolished.
220 m away · filed Jan 8, 2024 · Approved
47 Lankin Blvd · Minor variance
To construct a new two-storey detached dwelling with an integral garage, a rear ground floor deck, a rear basement walkout, and a front covered porch.
140 m away · filed Aug 24, 2023 · Approved
171 Durant Ave · Minor variance
To construct a new two-storey detached dwelling with a covered front porch with stairs, rear ground floor deck with stairs, rear second floor balcony, and a rear basement walkout. Also, to alter the existing one-storey ancillary building (garage) in the rear yard by converting it into a two-storey garden suite, with a cantilevered second storey and a front (south) second floor balcony.
70 m away · filed Feb 3, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.