Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

1610 Gerrard St E

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Development charges deferral

    Deferred Fees from folder 26 136575 (RSN-5804514) ZoningProcess RSN 79379389

    Applied Apr 21, 2026 · completed Apr 27, 2026 · Permit 26 136575 BLD

    Cancelled
  • Heating and ventilation

    HVAC - Proposal for interior alterations to construct a cafe and pilates studio.

    Applied Apr 16, 2026 · issued Apr 29, 2026 · completed Aug 18, 2026 · Permit 26 136575 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to construct a cafe and pilates studio.

    Applied Apr 16, 2026 · issued Apr 29, 2026 · completed Aug 18, 2026 · Permit 26 136575 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to construct a cafe and pilates studio.

    Applied Mar 30, 2026 · issued Apr 29, 2026 · completed Aug 24, 2026 · Permit 26 136575 BLD

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations and new store front in existing art gallery .

    Applied Oct 28, 2016 · issued Nov 10, 2016 · completed May 18, 2021 · Permit 16 244003 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 4 Newbold Avenue

    10 storeys · 70 homes · Residential

    300 m away · Rezoning · Under review · filed Apr 16, 2025

    Under review
  • 355 Coxwell Avenue

    33 homes · Residential

    310 m away · Condominium · Approved · filed Jun 23, 2026

    Approved
  • 1400 Gerrard Street East

    7 storeys · 19 homes · Mixed use

    320 m away · Site plan · Under review · filed May 2, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 253 Ashdale Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear one-storey addition and a rear ground floor deck with stairs.

    180 m away · filed Sep 9, 2026 · Hearing scheduled

  • 417 Craven Rd · Minor variance

    To construct a new three-storey detached dwelling (houseplex) with front and rear balconies located on the second and third levels, front and rear basement walkouts, a front covered porch with stairs, and a rear covered ground floor deck with stairs. There will be a total of six residential dwelling units on this lot.

    190 m away · filed Mar 31, 2026 · Deferred

  • 1416 Gerrard St E · Minor variance

    To alter the existing two-storey mixed-use building by converting the rear portion of ground floor area into a new cafe/sandwich shop, and to construct a total of seven hotel rooms (two within the basement and five on the second level). The existing restaurant within the front portion of the ground floor, and the storage area within a portion of the basement area will be maintained.

    240 m away · filed Mar 5, 2026 · Approved

  • 261 Rhodes Ave · Minor variance

    To legalize and to maintain the front porch and front second floor balcony of the exsiting X-storey detached dwelling, which were constructed without the benefit of an authorized building permit,

    110 m away · filed Jan 6, 2026 · Postponed

  • 149 Gainsborough Rd · Minor variance

    To convert the existing three-storey detached dwelling (fourplex) into an apartment building with a total of 13 residential dwelling units, by constructing a rear four-storey addition. Along the south side of this building, there will be at-grade patios, a first level exterior corridor, balconies on the first to fourth levels, and patios on the fourth level. There will also be a first level exterior staircase on the east side of this building, as well as 14 bicycle parking spaces along a portion of the south side lot line, and 1 accessible parking space in the rear yard.

    230 m away · filed Oct 25, 2024 · Approved

  • 188 Coxwell Ave · Minor variance

    To alter the existing rear one-storey ancillary building (detached garage) into two garden suites, by constructing a complete second storey addition. Each garden suite will have two-levels. There will be a total of three residential dwelling units on this lot (one unit within the main dwelling and two units within the ancillary building). The rear deck and shed will be demolished and a parking pad will be constructed.

    220 m away · filed Sep 24, 2024 · Refused

  • 337 Craven Rd · Consent

    To obtain consent for the technical severance of the property for the purpose of re-establishing two residential lots which merged on title and to maintain the existing easements/rights-of-way.

    230 m away · filed May 10, 2024 · Approved

  • 89 Gainsborough Rd · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition with a front second storey balcony and wall projections on the ground floor below, a covered front porch with stairs, a rear porch with stairs (covered by a cantilevered portion of the second storey addition), and a rear ground floor deck with stairs. There will be two residential dwelling units within this dwelling (one primary unit and one secondary suite within the basement).

    190 m away · filed Feb 14, 2024 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.