Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

165 Mortimer Ave

The City of Toronto has 5 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposal to install 1 backflow device in existing SFD-Semi

    Applied Aug 11, 2017 · issued Aug 14, 2017 · completed Mar 7, 2018 · Permit 17 215062 DRN

    Closed
  • Small residential project · Interior alterations

    Rev 01- Revision to proposed ground floor interior alterations as per bubbled drawings.PROPOSED INTERIOR ALTERATIONS IN BASEMENT AND GROUND FLOORS

    Applied Jul 28, 2017 · issued Aug 16, 2017 · completed Mar 7, 2018 · Permit 17 189233 BLD (revision 01)

    Closed
  • Plumbing

    Plumbing - PROPOSED INTERIOR ALTERATIONS IN BASEMENT AND GROUND FLOORS

    Applied Jun 28, 2017 · issued Jul 10, 2017 · completed Mar 7, 2018 · Permit 17 189233 PLB

    Closed
  • Small residential project · Interior alterations

    Proposed interior alterations in basement and ground floors

    Applied Jun 28, 2017 · issued Jul 10, 2017 · completed Mar 7, 2018 · Permit 17 189233 BLD

    Closed
  • Small residential project · Carport

    construct carport

    Applied Jun 15, 2004 · issued Jun 15, 2004 · Permit 04 146804 BLD

    Work not started

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 28 East York Ave · Minor variance

    To alter the existing three-storey townhouse dwelling by constructing an extension to the rear first floor deck (cantilevered over the existing driveway and parking space, which will be maintained and unaltered).

    180 m away · filed Sep 2, 2026 · Hearing scheduled

  • 45 Kings Park Blvd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front second storey addition (above the existing covered front porch).

    140 m away · filed Oct 3, 2025 · Approved

  • 193 Mortimer Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by enclosing the existing front porch into habitable space.

    100 m away · filed Feb 19, 2025 · Approved

  • 46 Sammon Ave · Minor variance

    To alter the existing one-and-one-half-storey semi-detached dwelling by constructing a front one-storey addition (enclosing the front porch), a rear two-storey addition, and a rear ground floor covered deck with stairs. The existing rear ground floor landing and stairs will be demolished.

    140 m away · filed May 2, 2024 · Approved

  • 54 Sammon Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a rear two-storey cantilevered addition, a partial front one-storey addition (bay window), a rear ground floor terrace, and a basement secondary suite.

    160 m away · filed Nov 20, 2023 · Approved

  • 169 Woodycrest Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a new front porch, which will be enclosed and to reconstruct the front stairs.

    180 m away · filed Sep 7, 2023 · Approved

  • 860 Pape Ave · Minor variance

    To permit a 'Kennel and Pet Services' use within the existing two-storey building.

    220 m away · filed Apr 13, 2023 · Approved

  • 34 Aldwych Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by adding a front and rear second storey additions, a rear second storey balcony, and to install a secondary suite within the basement, with a rear walkout.

    220 m away · filed Dec 7, 2022 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.