Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

1669 Dundas St W

The City of Toronto has 7 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade · Fire alarm

    Proposal to replace the fire alarm system in the existing multiple use building.

    Applied Nov 21, 2016 · issued Nov 23, 2016 · completed Mar 28, 2017 · Permit 16 253954 FSU

    Closed
  • Heating and ventilation · HVAC: groups D & E

    Alterations to HVAC system for retail store.

    Applied Oct 5, 2016 · issued Oct 7, 2016 · completed Jun 11, 2026 · Permit 16 233270 MSA

    Closed
  • Addition or alteration · Multiple projects

    REVISION - as per drawingsProposal for basement walk out at front, interior alteration to salon in basement (10m2), interior alterations to office (10m2) on ground floor and interior alterations to residential unit on 2nd floor (10m2) of an existing 2 storey building.

    Applied Feb 3, 2016 · issued Feb 18, 2016 · Permit 13 198633 BLD (revision 01)

    Revision issued
  • Heating and ventilation · Other

    Proposal for alterations to existing HVAC system for 2nd floor single family dwelling.

    Applied Aug 18, 2015 · issued Aug 21, 2015 · Permit 15 208392 MSA

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for basement walk out at front, interior alteration to salon in basement (10m2), interior alterations to office (10m2) on ground floor and interior alterations to residential unit on 2nd floor (10m2) of an existing 2 storey building.

    Applied Feb 12, 2014 · issued Feb 13, 2014 · Permit 13 198633 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for basement walk out at front, interior alteration to salon in basement (10m2), interior alterations to office (10m2) on ground floor and interior alterations to residential unit on 2nd floor (10m2) of an existing 2 storey building.

    Applied Feb 12, 2014 · issued Feb 13, 2014 · Permit 13 198633 PLB

    Inspections under way
  • Addition or alteration · Multiple projects

    Proposal for basement walk out at front, interior alteration to salon in basement (10m2), interior alterations to office (10m2) on ground floor and interior alterations to residential unit on 2nd floor (10m2) of an existing 2 storey building.

    Applied Jul 4, 2013 · issued Sep 19, 2013 · Permit 13 198633 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 1596 Dundas St W · Minor variance

    To alter the existing three-storey mixed-use building (containing a ground floor commercial unit and ten residential dwelling units) by converting the existing storage space into three new residential dwelling units (two dwelling units in the basement, and one dwelling unit on the ground level). The existing 12 long-term bicycle parking spaces and 4 short-term bicycle parking spaces will be maintained and unaltered. There will be a total of 13 residential dwelling units on this lot.

    170 m away · filed Oct 20, 2025 · Approved

  • 94 St Clarens Ave · Minor variance

    To construct a new two-storey ancillary building (including a basement walkout with one laneway suite), in the rear yard, abutting the laneway. The second storey will be cantilevered on the south side.

    110 m away · filed Jun 30, 2025 · Refused

  • 163 St Clarens Ave · Minor variance

    To construct a new three-storey detached dwelling (fourplex) with a front ground floor landing with stairs, a side (north) ground floor walkout, two rear ground floor landings with stairs and two third floor side (north) terraces (Unit A and Unit C). Also, to construct a new two-storey laneway suite in the rear yard with a front (west) second floor terrace. There will be a total of five dwelling units on the lot (four units within the main dwelling and one unit within the laneway suite). The existing rear detached garage will be demolished.

    200 m away · filed May 13, 2025 · Approved

  • 33 St Clarens Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing one residential unit within the basement, a new front porch with stairs and canopy, and a front basement walkout. There will be a total of two residential dwelling units on this lot. The existing rear one-storey ancillary building (garage) will be maintained and unaltered.

    220 m away · filed Feb 7, 2025 · Approved

  • 66 St Clarens Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a front deck. Also, to construct rear one and three-storey additions with a ground level deck and stairs.

    140 m away · filed Jan 13, 2025 · Approved

  • 27 Northern Pl · Minor variance

    To alter the existing two-storey semi-detached townhouse dwelling by constructing a complete third storey addition.

    230 m away · filed Jun 15, 2023 · Approved

  • 10 Hickson St · Consent

    To obtain consent for a technical severance to re-establish pre-existing lot lines of three residential lots which merged on title.

    100 m away · filed Mar 23, 2023 · Approved

  • 1205 College St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, a rear ground level deck, and front and rear second floor balconies. There will be three dwelling units (one primary unit and two secondary suites) on this lot.

    220 m away · filed Feb 23, 2023 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.