Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

167 Ava Rd

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - SELECTIVE INTERIOR ALTERATIONS ON EACH FLOOR

    Applied Jan 12, 2022 · issued Jan 21, 2022 · completed Feb 3, 2023 · Permit 22 103288 PLB

    Closed
  • Small residential project · Interior alterations

    Selective interior alterations on each floor

    Applied Jan 12, 2022 · issued Jan 21, 2022 · completed Feb 3, 2023 · Permit 22 103288 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 143 Strathearn Rd · Minor variance

    To construct a new three-storey detached dwelling with a front integral two-car garage, a widened driveway, a front porch with a canopy and stairs, a rear basement walkout, a rear covered ground floor deck with stairs, a rear second floor terrace, a rear covered third floor terrace, and a rear in-ground swimming pool. Also, to construct an ancillary structure (pool equipment pad), in the rear yard, abutting the west side lot line.

    120 m away · filed Aug 31, 2026 · Hearing scheduled

  • 175 Strathearn Rd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front one-storey addition with a new semi-covered porch with stairs, a rear two-storey addition (including an entrance from the north side of the dwelling with covered stairs), and a new rear ground floor semi-covered deck with stairs. Also, to construct a front yard parking pad with a walkway (connecting the parking pad with the north side entrance).

    150 m away · filed May 19, 2026 · Approved

  • 202 Strathearn Rd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition above the existing first floor (which will be partially cantilevered along the south side), and a new rear ground floor deck with stairs.

    240 m away · filed Apr 24, 2026 · Approved

  • 163 Ava Rd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a two-storey front addition (extension to the integral garage), a rear two-storey addition, a partial third storey addition (loft area), and a rear ground floor deck. Also, to construct an inground swimming pool in the rear yard.

    30 m away · filed Jan 13, 2026 · Approved

  • 153 Strathearn Rd · Minor variance

    To construct a new three-storey detached dwelling with a front covered porch, a front integral garage, a rear ground floor deck, and a rear third storey balcony. Also, to construct a one-storey ancillary building (cabana) and an in-ground swimming pool in the rear yard.

    90 m away · filed Apr 7, 2025 · Approved

  • 136 Strathearn Rd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a side (north) second storey addition (above the existing attached garage), a rear one-storey addition, a covered front porch with stairs, and a rear ground floor deck and paved court.

    160 m away · filed Feb 24, 2025 · Approved

  • 176 Ava Rd · Minor variance

    To alter the existing two-storey detached dwelling by constructing side (west) and rear second storey additions (above the existing dwelling) and a rear second floor balcony.

    70 m away · filed Jul 5, 2024 · Approved

  • 154 Ava Rd · Consent

    To obtain consent to sever the property into two undersized residential lots.

    80 m away · filed Jun 26, 2024 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.