Toronto address · Ward 14, Toronto-Danforth
167 Fulton Ave
The City of Toronto has 4 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
REV01: Revison to permit 19-160465 PLB to create new 3-piece basement bathroom rough-in. Plumbing - interior alterations to floors 1-3
Applied Jun 26, 2019 · issued Jun 27, 2019 · completed Nov 25, 2021 · Permit 19 160465 PLB (revision 01)
- Closed
Heating and ventilation
HVAC - interior alterations to floors 1-3
Applied May 30, 2019 · issued Jun 27, 2019 · completed Dec 7, 2021 · Permit 19 160465 HVA
- Closed
Plumbing
Plumbing - interior alterations to floors 1-3
Applied May 27, 2019 · issued Jun 14, 2019 · completed Nov 25, 2021 · Permit 19 160465 PLB
- Closed
Small residential project · Interior alterations
interior alterations to all floors
Applied May 27, 2019 · issued Jun 14, 2019 · completed Nov 25, 2021 · Permit 19 160465 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
120 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey dormer addition with a rooftop deck.
190 m away · filed Jul 29, 2026 · Hearing scheduled
224 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by enclosing a portion of the front porch (for habitable space), a front third floor dormer expansion, a rear basement window well, a rear cantilevered second floor addition, and a rear third floor dormer addition with a rooftop deck (above the existing rear addition). The existing rear one-storey addition will be demolished.
180 m away · filed Mar 12, 2026 · Approved
157 Browning Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition, a front new canopy above the existing porch, and a rear three-storey addition with a deck and stairs.
90 m away · filed May 30, 2025 · Approved
141 Arundel Ave · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a rear one-storey addition (to replace the existing one-storey addition).
150 m away · filed Jul 11, 2024 · Approved
196 Fulton Ave · Minor variance
To construct a new one-storey ancillary building (detached garage with an undersized parking space) in the rear yard of the existing two-storey semi-detached dwelling. The existing detached garage, shed, and a portion of the rear ground floor deck will be demolished.
100 m away · filed May 30, 2024 · Approved
889 Carlaw Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a rear balcony.
230 m away · filed Dec 13, 2023 · Approved
128 Arundel Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition. Also, to construct a one-storey ancillary building (detached garage), in the rear yard, abutting the laneway.
240 m away · filed Dec 7, 2023 · Approved
51 Nealon Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a front planter and a rear terrace.
250 m away · filed Apr 3, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.