Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 6, York Centre

168 Sandringham Dr

The City of Toronto has 5 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Alternative solution

    The firewall is constructed of reinforced concrete proving a fire resistance rating of at least 2 hours.- Both buildings have direct access to the exterior,- A fire on either side of the firewall will not cause the firewall to fail for at least a 2 hour period

    Applied Sep 22, 2026 · Permit 26 241805 ALT

    Application received
  • Demolition

    Proposal to demolish existing 2 storey dwelling

    Applied Jul 15, 2026 · 1 home removed · Permit 26 202443 DEM

    Ready for issuance
  • New house · New building

    Proposed new 2 storey single family dwelling, ear deck, rear walk-out, and front porch.

    Applied Jul 15, 2026 · 1 home added · Permit 26 202442 BLD

    Examiner's notice sent
  • Drains and site services

    Drain - Proposed new 2 storey single family dwelling, ear deck, rear walk-out, and front porch.

    Applied Jul 15, 2026 · Permit 26 202442 DRN

    Issuance pending
  • Plumbing

    Plumbing - Proposed new 2 storey single family dwelling, ear deck, rear walk-out, and front porch.

    Applied Jul 15, 2026 · Permit 26 202442 PLB

    Issuance pending

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new two-storey detached dwelling with an integral garage, front porch, rear balconies and an ancillary structure (cabana) in the rear yard.

    Decision: Approved on condition (hearing Apr 16, 2026)

    Filed Feb 23, 2026 · File A0076/26NY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 22 Kirkton Rd · Minor variance

    To alter the existing detached dwelling by constructing a rear basement addition with a covered porch above and a lower covered patio, as well as a second storey balcony, in conjunction with a garden suite in the rear yard of the property.

    200 m away · filed May 25, 2026 · Approved

  • 17 Kirkton Rd · Minor variance

    To legalize and maintain the rear yard concrete sports court.

    190 m away · filed Aug 12, 2024 · Approved on condition

  • 25 Kirkton Rd · Minor variance

    Proposal to construct a new single family dwelling

    150 m away · filed Dec 20, 2022 · Approved

  • 80 Bideford Ave · Minor variance

    Proposal to construct a new dwelling.

    250 m away · filed Sep 19, 2022 · Approved

  • 11 Kirkton Rd · Minor variance

    Proposal to construct a new dwelling.

    230 m away · filed May 5, 2022 · Approved

  • 172 Sandringham Dr · Minor variance

    Rear deck extension and detached cabana with changeroom and washroom

    30 m away · filed Mar 18, 2022 · Approved

  • 17 Kirkton Rd · Minor variance

    Proposal for an addition to the exsiting dwelling, to attach new garage and rear yard addition with covered amenity space in the rear yard.

    190 m away · filed Mar 14, 2022 · Approved

  • 88 Bideford Ave · Minor variance

    To construct a cabana, an inground pool and hardscape area in the rear yard.

    190 m away · filed Feb 1, 2022 · Approved

Everything planned in York Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.