Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 6, York Centre

169 Downsview Ave

The City of Toronto has 5 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Revision to originally approved permit (see attached cover letter for details).

    Applied Sep 24, 2018 · issued Oct 31, 2018 · Permit 17 251645 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Proposal to cosntruct rear second floor addition and interior alterations to existing sfd

    Applied Oct 23, 2017 · issued Jan 17, 2018 · Permit 17 251645 HVA

    Inspections under way
  • Small residential project · Multiple projects

    Proposal to cosntruct rear second floor addition and interior alterations to existing sfd

    Applied Oct 23, 2017 · issued Jan 17, 2018 · Permit 17 251645 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal to cosntruct rear second floor addition and interior alterations to existing sfd

    Applied Oct 23, 2017 · issued Jan 17, 2018 · Permit 17 251645 PLB

    Inspections under way
  • Small residential project · Walk-Out stair

    construct walk out stair

    Applied Apr 18, 2016 · issued May 17, 2016 · Permit 16 142225 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a new second storey addition to the front portion of the existing dwelling.

    Hearing Apr 6, 2017

    Filed Nov 2, 2016 · File A0945/16NY

    Notice prepared

What’s planned nearby

Development sites within 500 m

  • 1265 Wilson Avenue

    25 storeys · 559 homes · Residential

    460 m away · Rezoning · Under appeal · filed Sep 29, 2021

    Under appeal

Neighbours’ Committee of Adjustment files within 250 m

  • 167 Downsview Ave · Minor variance

    To alter the existing one-storey dwelling by constructing a front, rear and side split addition.

    20 m away · filed Jul 11, 2024 · Approved

  • 34 Highview Ave · Minor variance

    Proposal to construct a new dwelling. File numbers B0039/22NY, A0608/22NY, A0609/22NY will be jointly considered.

    70 m away · filed Sep 7, 2022 · Approved

  • 34 Highview Ave · Minor variance

    Proposal to construct a new dwelling. File numbers B0039/22NY, A0608/22NY, A0609/22NY will be jointly considered.

    70 m away · filed Sep 7, 2022 · Approved

  • 34 Highview Ave · Consent

    To obtain consent to sever the property into two undersized residential lots to construct two new homes. File numbers B0039/22NY, A0608/22NY, A0609/22NY will be jointly considered.

    70 m away · filed Sep 7, 2022 · Approved

  • 191 Downsview Ave · Minor variance

    Proposal to demolish existing single family dwelling to construct a new 2 storey detached single family dwelling with integral garage.

    130 m away · filed May 24, 2022 · Approved

Everything planned in York Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.