Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

169 Linsmore Cres

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposal to install a backwater valve for existing semi

    Applied Jul 15, 2020 · issued Jul 15, 2020 · completed Jul 20, 2020 · Permit 20 168056 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 48 Queensdale Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with rear exterior stairs. The existing rear deck will be demolished.

    210 m away · filed May 25, 2026 · Approved

  • 208 Linsmore Cres · Minor variance

    To legalize and maintain the building height of the existing two-storey detached dwelling (as approved by Minor Variance Decision A0187/22TEY), which was constructed beyond the limits of the authorized building permit No. 22 219682 BLD 00 NH.

    180 m away · filed May 6, 2026 · Approved

  • 385 Sammon Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front one-storey addition (porch enclosure).

    180 m away · filed Feb 27, 2026 · Approved

  • 353 Monarch Park Ave · Minor variance

    To alter the existing two-storey detached dwelling by converting the integral garage into habitable space. Also, to permit a front yard parking space.

    240 m away · filed Feb 13, 2026 · Approved

  • 65 Leroy Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a new deck with stairs and a pergola in the rear yard.

    230 m away · filed Feb 13, 2026 · Approved

  • 6 Kimbourne Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition (the existing rear one-storey will be demolished) with a ground floor deck and stairs. Also, to construct a new one-storey ancillary building (detached shed), in the rear yard of the property. The existing rear ancillary building (semi-detached garage) will be demolished.

    150 m away · filed Sep 23, 2025 · Approved

  • 356 Monarch Park Ave · Minor variance

    To alter the existing one-and-one-half-storey detached dwelling by constructing a complete second storey addition- (which will be cantilevered on the south side) with front and rear balconies, a rear one-storey addition, a front one-storey addition with a covered porch, a rear ground floor deck, and a rear basement walkout. Also, to construct a new one-storey detached ancillary building (to contain a garage), in the rear yard. There will be a total of two residential dwelling units on this lot (one unit within the basement level and one unit occupying the first and second levels).

    230 m away · filed Aug 14, 2025 · Approved

  • 38 Leroy Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing front and rear one-storey additions on the first level, a front porch with stairs, a rear deck with stairs, and a rear at-grade patio. The existing ancillary building (detached garage), in the rear yard, will be maintained and unaltered.

    200 m away · filed May 28, 2025 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.