Toronto address · Ward 21, Scarborough Centre
17 Belmore Ave
The City of Toronto has 7 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Deck
Proposed Deck and Pergola a. First level Deck is 30" high 2nd Level Deck is 60" high and 2nd Level Deck is 16" lower than existing porch. b. Pergola will be built on the the existing porch
Applied Sep 2, 2021 · issued Jun 21, 2022 · Permit 21 207638 BLD
- Closed
Heating and ventilation
HVAC - To construct a new, 250m2 - 2 storey detached dwelling complete with integral garage, finished basement, walk-up basement stair and balcony at second floor.
Applied Jan 19, 2016 · issued Mar 1, 2016 · completed Aug 29, 2017 · Permit 15 183146 HVA
- Closed
Drains and site services
Drain - To construct a new, 250m2 - 2 storey detached dwelling complete with integral garage, finished basement, walk-up basement stair and balcony at second floor.
Applied Jan 19, 2016 · issued Jan 19, 2016 · completed Aug 29, 2017 · Permit 15 183146 DRN
- Closed
Plumbing
Plumbing - To construct a new, 250m2 - 2 storey detached dwelling complete with integral garage, finished basement, walk-up basement stair and balcony at second floor.
Applied Jan 19, 2016 · issued Jan 19, 2016 · completed Aug 29, 2017 · Permit 15 183146 PLB
- Closed
New house · New building
REV #1-REDUCE GARAGE SIZE, SIDE YARD SETBACK, WINDOW SOUTH SIDETo construct a new, 250m2 - 2 storey detached dwelling complete with integral garage, finished basement, walk-up basement stair and balcony at second floor.
Applied Nov 13, 2015 · issued Nov 27, 2015 · completed Aug 29, 2017 · Permit 15 183146 BLD (revision 01)
- Closed
New house · New building
To construct a new, 250m2 - 2 storey detached dwelling complete with integral garage, finished basement, walk-up basement stair and balcony at second floor.
Applied Jun 30, 2015 · issued Jul 16, 2015 · completed Aug 29, 2017 · 1 home added · Permit 15 183146 BLD
- Closed
Demolition
to demolish existing single storey dwelling in relation to construction of a new house on same lot.
Applied Jun 30, 2015 · issued Jul 16, 2015 · completed Apr 30, 2020 · 1 home removed · Permit 15 183162 DEM
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To construct a rear yard deck. A previous Committee of Adjustment application was approved to construct a second storey addition, a new integral garage, and a new covered porch. (A038/14SC)
Decision: Approved (hearing May 5, 2022)
Filed Mar 16, 2022 · File A0053/22SC
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
22 Burnley Ave · Minor variance
To alter the existing one-storey dwelling with a rear and south side yard two-storey addition and demolishing the existing detached garage. There will be a total of two dwelling units on the lot. This application was previously deferred at the February 12, 2025 hearing.
150 m away · filed Sep 30, 2024 · Approved
20 Chrysler Cres · Minor variance
170 m away · filed Apr 29, 2024 · Application withdrawn
8 Deanvar Ave · Minor variance
The owner is proposing to construct a second suite in the basement of the existing house, and a 19 m2 shed in the rear yard.
220 m away · filed Jul 3, 2014 · Application withdrawn
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.