Toronto address · Ward 14, Toronto-Danforth
17 Dilworth Cres
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Installation of backwater valve and repairs to existing drains
Applied Dec 5, 2017 · issued Dec 6, 2017 · completed Dec 8, 2017 · Permit 17 271360 DRN
- Closed
Small residential project · Other
Demolish existing rear detached garage and maintain 2.6mx5.6m parking pad.
Applied May 3, 2010 · issued May 3, 2010 · completed Nov 28, 2022 · Permit 10 167989 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
8-40 Gowan Avenue and 5-19 Cosburn Avenue
24 storeys · 424 homes · Residential
460 m away · Site plan · Under review · filed Apr 26, 2022
- Submitted
16 storeys · 332 homes · Mixed use
480 m away · Site plan · Submitted · filed Apr 2, 2026
Neighbours’ Committee of Adjustment files within 250 m
28 East York Ave · Minor variance
To alter the existing three-storey townhouse dwelling by constructing an extension to the rear first floor deck (cantilevered over the existing driveway and parking space, which will be maintained and unaltered).
200 m away · filed Sep 2, 2026 · Hearing scheduled
157 Westwood Ave · Minor variance
To construct a new one-storey detached ancillary building (one-car garage), in the rear yard, abutting Carlaw Avenue. The existing detached garage will be demolished.
150 m away · filed Jun 17, 2026 · Hearing scheduled
224 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by enclosing a portion of the front porch (for habitable space), a front third floor dormer expansion, a rear basement window well, a rear cantilevered second floor addition, and a rear third floor dormer addition with a rooftop deck (above the existing rear addition). The existing rear one-storey addition will be demolished.
170 m away · filed Mar 12, 2026 · Approved
78 Westwood Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition. The existing rear one-storey addition will be demolished, and the existing shed in the rear yard will be maintained and unaltered.
240 m away · filed Jun 17, 2024 · Approved
196 Fulton Ave · Minor variance
To construct a new one-storey ancillary building (detached garage with an undersized parking space) in the rear yard of the existing two-storey semi-detached dwelling. The existing detached garage, shed, and a portion of the rear ground floor deck will be demolished.
130 m away · filed May 30, 2024 · Approved
202 Browning Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third-storey addition.
250 m away · filed Mar 24, 2022 · Approved
92 Mortimer Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a second storey balcony above, a rear ground floor deck, and to enclose the existing covered porch.
190 m away · filed Mar 15, 2022 · Approved
168 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by: constructing a third storey addition with a rear deck; installing a secondary suite within the basement; and rebuilding the rear ground floor deck. Also, to construct an ancillary structure (shed) in the rear yard of the property.
140 m away · filed Jan 12, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.