Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

17 Dora Ave

The City of Toronto has 10 building permits since 2017 (7 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Inside and outside drains

    Drain - Water, Storm and Sanitary Site Services to support new transit station building, platforms, covered shelters, hub rooms and Maintenance Building.Transit Station - (606.28 m2) lower level entrance with vestibule, 2 stairs and 2 elevators leading to upper track east and west platforms. Covered shelters at platform level. 2 Hub Rooms (26.52m2) at platforms, Maintenance Building (416.61 m2) unoccupied with no public access. Public access to Vestibule at Bloor Street West, to platforms at Dora Ave and Sterling Ave

    Applied Dec 19, 2025 · Permit 24 252253 STS

    Under review
  • Heating and ventilation

    HVAC - Proposal to provide HVAC systems for the Lower-Level Station Building, Elevators, Mini-hub rooms, and Maintenance Building, including heating, cooling, and ventilation, as well as snow melt systems for passenger platforms.Transit Station - (606.28 m2) lower level entrance with vestibule, 2 stairs and 2 elevators leading to upper track east and west platforms. Covered shelters at platform level. 2 Hub Rooms (26.52m2) at platforms, Maintenance Building (416.61 m2) unoccupied with no public access. Public access to Vestibule at Bloor Street West, to platforms at Dora Ave and Sterling Ave

    Applied Dec 19, 2025 · issued Feb 2, 2026 · Permit 24 252253 HVA

    Permit issued
  • Drains and site services

    Drain - Water, Storm and Sanitary Site Services to support new transit station building, platforms, covered shelters, hub rooms and Maintenance Building.Transit Station - (606.28 m2) lower level entrance with vestibule, 2 stairs and 2 elevators leading to upper track east and west platforms. Covered shelters at platform level. 2 Hub Rooms (26.52m2) at platforms, Maintenance Building (416.61 m2) unoccupied with no public access. Public access to Vestibule at Bloor Street West, to platforms at Dora Ave and Sterling Ave

    Applied Dec 19, 2025 · issued Jan 27, 2026 · Permit 24 252253 DRN

    Permit issued
  • Plumbing

    Plumbing - Provide domestic water, sanitary drainage, and storm drainage systems for the Lower-Level Station Building; storm drainage systems for elevators, mini-hub rooms, stair entrances, platform shelters, and mini-platforms; non-freeze ground hydrants on passenger platforms; and domestic water, sanitary drainage, and storm drainage systems for the Maintenance Building and secure bike storage at the Dora Avenue entrance.Transit Station - (606.28 m2) lower level entrance with vestibule, 2 stairs and 2 elevators leading to upper track east and west platforms. Covered shelters at platform lev…

    Applied Dec 19, 2025 · issued Feb 2, 2026 · Permit 24 252253 PLB

    Permit issued
  • Alternative solution

    Proposed Alternative Solution application for Timed Egress Analysis of the Bloor Lansdowne SmartTrack Station

    Applied Oct 22, 2025 · completed Nov 3, 2025 · Permit 25 243358 ALT

    Approved
  • Partial permit · Partial permit - shoring

    Part Permit - Transit Station - (606.28 m2) lower level entrance with vestibule, 2 stairs and 2 elevators leading to upper track east and west platforms. Covered shelters at platform level. 2 Hub Rooms (26.52m2) at platforms, Maintenance Building (416.61 m2) unoccupied with no public access. Public access to Vestibule at Bloor Street West, to platforms at Dora Ave and Sterling Ave

    Applied Mar 10, 2025 · completed Jul 25, 2025 · Permit 24 252253 SHO

    Superseded
  • Partial permit · Partial permit - foundation

    Part Permit - Transit Station - (606.28 m2) lower level entrance with vestibule, 2 stairs and 2 elevators leading to upper track east and west platforms. Covered shelters at platform level. 2 Hub Rooms (26.52m2) at platforms, Maintenance Building (416.61 m2) unoccupied with no public access. Public access to Vestibule at Bloor Street West, to platforms at Dora Ave and Sterling Ave

    Applied Mar 4, 2025 · issued May 8, 2026 · completed May 8, 2026 · Permit 24 252253 FND

    Closed
  • New building

    Transit Station - (606.28 m2) lower level entrance with vestibule, 2 stairs and 2 elevators leading to upper track east and west platforms. Covered shelters at platform level. 2 Hub Rooms (26.52m2) at platforms, Maintenance Building (416.61 m2) unoccupied with no public access. Public access to Vestibule at Bloor Street West, to platforms at Dora Ave and Sterling Ave

    Applied Dec 19, 2024 · issued May 8, 2026 · Permit 24 252253 BLD

    Inspections under way
  • Demolition

    Proposal for demolish/remove existing (non -residential) building within the property limit, grade to match existing level

    Applied Dec 18, 2023 · issued Sep 26, 2024 · 1 home removed · Permit 23 236694 DEM

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to remove sprinklers.

    Applied Aug 15, 2018 · issued Dec 21, 2018 · completed May 16, 2025 · Permit 18 209683 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 150-158 Sterling Road

    13 storeys · Mixed use

    180 m away · Site plan · Under review · filed Apr 22, 2022

    Under review
  • 158 Sterling Road

    31 storeys · 388 homes · Mixed use

    200 m away · Site plan · Under review · filed May 30, 2024

    Under review
  • 158-200 Sterling Road

    11 storeys · Non-residential

    240 m away · Site plan · Under review · filed Aug 15, 2022

    Under review
  • 1319 Bloor Street West

    33 storeys · 634 homes · Mixed use

    290 m away · Site plan · Under review · filed Aug 30, 2021

    Under review
  • 510-514 Lansdowne Avenue and 1293-1301 Bloor Street West

    28 storeys · Mixed use

    300 m away · Site plan · Under review · filed Aug 9, 2022

    Under review
  • 221 Sterling Road

    21 storeys · 861 homes · Residential

    350 m away · Site plan · Under review · filed Nov 7, 2024

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 462 Lansdowne Ave · Minor variance

    To legalize and to maintain the front one-storey addition (front porch enclosure) with stairs of the existing two-storey semi-detached dwelling, that was constructed without an authorized building permit.

    200 m away · filed Mar 20, 2026 · Postponed

  • 1319 Bloor St W · Consent

    To obtain consent to sever the property into two mixed-use lots and to create new easements/rights-of-way.

    250 m away · filed Sep 3, 2025 · Approved

  • 587 Lansdowne Ave · Minor variance

    To alter the existing one-storey detached building (TTC traction power substation) by constructing a rear one-storey addition with a side (south) exterior platform and staircase to access this addition. Also, to replace the existing electrical transformers in the rear yard.

    230 m away · filed Jun 13, 2025 · Approved

  • 1319 Bloor St W · Minor variance

    To permit the construction of the Bloor Lansdowne SmartTrack GO Station, which consists of the main entrance building (municipally known as 1325 Bloor Street West), and a maintenance building with bicycle parking, and a partially enclosed waste and recycling storage area (municipally known as 17 Dora Avenue). The station also includes a West Access Building as well as other station elements (including the platforms, waiting enclosures, a pedestrian tunnel to access the westerly platform, stairs and elevators) will be located within the rail corridor and not part of the subject lands (municipa…

    250 m away · filed Apr 2, 2025 · Approved

  • 181 Sterling Rd · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 943-2015 (OMB), for a new 17-storey mixed-use building with 266 dwelling units, 2 retail units and 84 parking spaces within 2 levels of below grade garages (Block 4B) which is currently under construction, by reducing vehicular parking space sizes (length and width).

    60 m away · filed Jan 24, 2025 · Approved

  • 1319 Bloor St W · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 589-2022) for a 31-storey and 35-storey mixed-use building, by permitting an increase in building height and total gross floor area, and to modify the building envelope (setbacks and step-backs). There will be a total of 1,100 residential dwelling units on this lot.

    250 m away · filed Aug 16, 2024 · Approved

  • 181 Sterling Rd · Minor variance

    To alter the development standards, as approved under Site Specific Zoning By-law 943-2015 (OMB), which include adding an additional storey, changes to the overall height, setbacks, and parking standards, for the approved 16-storey mixed-use building (currently under construction).

    60 m away · filed Aug 14, 2023 · Approved

  • 150 Sterling Rd · Minor variance

    To facilitate the redevelopment of this site for a new 14-storey mixed-use building with 181 residential dwelling units, ground level retail space, a child care facility, and underground parking.

    220 m away · filed Jan 31, 2023 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.