Toronto address · Ward 5, York South-Weston
17 Kemp Sq
The City of Toronto has 4 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
New house · New building - by renovation
PROPOSED TWO STOREY SIDE & REAR ADDITION W/ ATTACHED GARAGE,PROPOSED SECOND STOREY ADDITION, INTERIOR ALTERATIONS (25SQ.M.) AND UNDERPINING(18m),REAR DECK AND SIDE BASEMENT WALKOUT AND SECOND UNIT.
Applied Aug 25, 2023 · issued Sep 21, 2023 · 1 home added · Permit 23 193822 BLD
- Closed
Heating and ventilation
HVAC - PROPOSED TWO STOREY SIDE & REAR ADDITION W/ ATTACHED GARAGE,PROPOSED SECOND STOREY ADDITION, INTERIOR ALTERATIONS (25SQ.M.) AND UNDERPINING(18m),REAR DECK AND SIDE BASEMENT WALKOUT AND SECOND UNIT.
Applied Aug 25, 2023 · issued Sep 21, 2023 · completed Jun 13, 2025 · Permit 23 193822 HVA
- Closed
Plumbing
Plumbing - PROPOSED TWO STOREY SIDE & REAR ADDITION W/ ATTACHED GARAGE,PROPOSED SECOND STOREY ADDITION, INTERIOR ALTERATIONS (25SQ.M.) AND UNDERPINING(18m),REAR DECK AND SIDE BASEMENT WALKOUT AND SECOND UNIT.
Applied Aug 25, 2023 · issued Sep 21, 2023 · completed Jun 13, 2025 · Permit 23 193822 PLB
- Closed
Drains and site services
Drain - PROPOSED TWO STOREY SIDE & REAR ADDITION W/ ATTACHED GARAGE,PROPOSED SECOND STOREY ADDITION, INTERIOR ALTERATIONS (25SQ.M.) AND UNDERPINING(18m),REAR DECK AND SIDE BASEMENT WALKOUT AND SECOND UNIT.
Applied Aug 25, 2023 · issued Sep 21, 2023 · completed Jun 13, 2025 · Permit 23 193822 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct two-storey front and rear additions, a second storey addition above the existing dwelling and a new covered front porch.
Decision: Approved (hearing Jul 20, 2023)
Filed Jun 6, 2023 · File A0232/23EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
4 Kemp Sq · Minor variance
To construct a new two-storey addition in the rear yard and a new second storey addition above the existing dwelling.
70 m away · filed May 8, 2026 · Approved
3 Nordale Cres · Minor variance
To construct a new dwelling with an attached garage.
160 m away · filed Sep 23, 2025 · Approved
92 Harding Ave · Consent
To obtain consent to sever the property into two undersized residential lots.
230 m away · filed Oct 6, 2023 · Approved
92 Harding Ave · Minor variance
To construct a new detached dwelling with an attached garage.
230 m away · filed Oct 6, 2023 · Approved
92 Harding Ave · Minor variance
To construct a new detached dwelling with an attached garage and maintain the ancillary building (greenhouse) in the rear yard.
230 m away · filed Oct 6, 2023 · Approved
3 Nordale Cres · Minor variance
To construct a new dwelling with an attached garage.
160 m away · filed Sep 20, 2022 · Deferred
10 Nordale Cres · Minor variance
To convert the existing attached garage into a new carport and to construct a new garage attached to the existing shed in the rear yard.
190 m away · filed Jan 6, 2021 · Approved
9 Nordale Cres · Consent
To obtain consent to sever the lot into two undersized residential lots.
210 m away · filed Nov 25, 2019 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.