Toronto address · Ward 9, Davenport
17 Symington Ave
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install a new back water valve
Applied Aug 29, 2018 · issued Aug 29, 2018 · completed Sep 4, 2018 · Permit 18 217262 DRN
- Closed
Heating and ventilation · Install/Alter HVAC - only
Supply and install h.v.a.c. system to proposed row house (unit type b).cost incl. 424953
Applied Feb 2, 2000 · issued Mar 2, 2000 · completed Oct 22, 2025 · Permit 00 125300 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
19 storeys · 325 homes · Mixed use
80 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
1423-1437 Bloor Street West and 278 Sterling Road
18 storeys · 197 homes · Mixed use
120 m away · Site plan · Under review · filed Aug 20, 2021
- Under review
21 storeys · 861 homes · Residential
150 m away · Site plan · Under review · filed Nov 7, 2024
- Approved
33 storeys · 377 homes · Residential
180 m away · Rezoning · Approved · filed Dec 24, 2025
- Approved
18 storeys · 262 homes · Residential
210 m away · Site plan · Approved · filed Oct 15, 2021
- Under review
33 storeys · 634 homes · Mixed use
230 m away · Site plan · Under review · filed Aug 30, 2021
Neighbours’ Committee of Adjustment files within 250 m
149 Perth Ave · Minor variance
To legalize and to maintain the existing one-storey detached dwelling (including one and two-storey rear additions) by constructing a front ground floor covered porch with stairs, a front second storey addition, and a new rear ground floor stairs (for the existing one-storey sunroom). The existing rear two-storey ancillary building (containing a garage and storage space) will be maintained and unaltered. There will be a total of three residential dwelling units on this lot.
180 m away · filed Feb 3, 2026 · Approved
83 Perth Ave · Minor variance
To legalize and to maintain the rear second floor addition (conversion of the existing rear second floor deck into habitable space) and the rear dormer third floor addition that were constructed without an authorized building permit. Also, to permit the reconstruction of a rear third floor rooftop deck (previously constructed without an authorized building permit and since removed).
140 m away · filed Aug 2, 2024 · Approved
230 Sterling Rd · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a rear two-storey addition. The existing rear basement walkout stairs, rear ground floor concrete pad, and a portion of the rear ground floor deck will be demolished.
230 m away · filed Aug 1, 2024 · Approved
72 Perth Ave · Minor variance
To alter the development standards for a new rental building (approved under Site Specific Zoning By-law 182-2022, as amended by City Wide By-law 569-2013, and Minor Variance Decision A0892/22TEY) by increasing the building height from 11 to 16 storeys, reducing the ground floor height, increasing the residential density, increasing the number of residential units from 128 to 211 units, amending the building setbacks/stepbacks and reducing the loading space provisions on site. The existing vacant two-story building (previously used as a place of worship) will be demolished.
210 m away · filed Feb 23, 2024 · Approved
59 Perth Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a partial third storey addition (within the attic), a rear two-storey addition with a second storey balcony and a rooftop deck (accessed from the third storey). There will be two residential dwelling units on this lot.
190 m away · filed Jan 8, 2024 · Approved
104 Campbell Ave · Minor variance
To legalize and to maintain the rear ground level addition (enclosed basement walkout entrance) and the above rear second floor walkout deck that were constructed without an authorized building permit.
200 m away · filed Dec 12, 2023 · Approved
89 Symington Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear third storey deck, and a rear ground floor deck. Also, to construct a one-storey ancillary building (garden suite) in the rear yard.
240 m away · filed Oct 30, 2023 · Approved
1423 Bloor St W · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 927-2022 for an 18-storey mixed-use building with a 6-storey podium, and one level of underground parking) by constructing two additional storeys, increasing the overall building height and residential gross floor area.
100 m away · filed Jul 5, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.