Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

17 Teignmouth Ave

The City of Toronto has 3 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Second Storey addition over the existing dwelling, minor interior alterations, and stairs - Addition(s)

    Applied Mar 22, 2005 · issued Mar 22, 2005 · completed Jun 8, 2026 · Permit 05 107637 PLB

    Closed (dormant)
  • Heating and ventilation

    HVAC - Second Storey addition over the existing dwelling, minor interior alterations, and stairs - Addition(s)

    Applied Mar 14, 2005 · issued Nov 2, 2006 · completed Jun 8, 2026 · Permit 05 107637 HVA

    Closed (dormant)
  • Small residential project · Addition(s)

    Second Storey addition over the existing dwelling, minor interior alterations, and stairs

    Applied Feb 9, 2005 · issued Mar 22, 2005 · Permit 05 107637 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 56 Bloem Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition (cantilevered at the front), and a rear one-storey addition (mudroom to replace the existing rear ground floor concrete deck). Also, to reconstruct the front porch stairs.

    170 m away · filed Mar 26, 2026 · Approved

  • 282 Earlscourt Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front ground floor addition (partial porch enclosure) with reconstructed stairs, and a front second floor deck (above the front ground floor addition).

    90 m away · filed Jun 19, 2024 · Approved

  • 164 Day Ave · Minor variance

    To permit the existing one-storey detached dwelling by converting the enclosed front porch into habitable space, and to construct a new covered front porch and stairs.

    180 m away · filed May 27, 2024 · Approved

  • 137 Morrison Ave · Minor variance

    To alter the existing two-storey detached dwelling by enclosing the existing front porch and to construct new front stairs.

    230 m away · filed Apr 18, 2023 · Approved

  • 341 Boon Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a front one-storey addition, a complete second storey addition, a new front walkway and stairs, and a new walkway in the rear yard.

    110 m away · filed Apr 11, 2022 · Approved

  • 109 Morrison Ave · Minor variance

    To alter the existing one-and-one-half-storey detached dwelling by constructing a second storey addition, a new rear ground floor deck, and to alter the front porch roof.

    230 m away · filed Mar 29, 2022 · Approved

  • 93 Hatherley Rd · Minor variance

    To convert the existing one-storey detached dwelling from one unit into two units by constructing: a new front covered porch, a second and third storey additions with rear second and third storey balconies, and a rear ground floor deck.

    220 m away · filed Feb 14, 2022 · Approved

  • 146 Morrison Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition and a rear ground floor deck.

    210 m away · filed Aug 19, 2021 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.