Toronto address · Ward 6, York Centre
17 Wendy Cres
The City of Toronto has 3 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal to construct rear ground floor addition, new two-storey side addition with new storey over existing garage, new rear deck, and basement underpinning/benching.
Applied Apr 20, 2022 · issued May 3, 2022 · completed Aug 30, 2023 · Permit 22 133250 HVA
- Closed
Plumbing
Plumbing - New rear ground floor addition and new two-storey side addition with new storey over existing garage.
Applied Apr 11, 2022 · issued Apr 25, 2022 · completed Aug 30, 2023 · Permit 22 133250 PLB
- Closed
Small residential project · Multiple projects
Proposal to construct rear ground floor addition, new two-storey side addition with new storey over existing garage, new rear deck, and basement underpinning/benching.
Applied Apr 11, 2022 · issued Apr 25, 2022 · completed Aug 30, 2023 · Permit 22 133250 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a rear ground floor addition, new two-storey side addition,and new 2nd storey over existing garage.
Decision: Approved (hearing Oct 7, 2021)
Filed Aug 18, 2021 · File A0584/21NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
28 Northmount Ave · Minor variance
To alter the existing dwelling by enclosing the existing front porch and constructing a new front porch and staircase.
200 m away · filed Aug 7, 2025 · Approved
18 Southgate Ave · Minor variance
To construct a new front addition, porch and permeable driveway.
190 m away · filed Apr 4, 2025 · Approved
25 Edinburgh Dr · Minor variance
To construct a new dwelling.
240 m away · filed Feb 19, 2025 · Approved
35 Southgate Ave · Minor variance
To construct a new detached dwelling.
160 m away · filed Sep 30, 2024 · Approved
14 Southgate Ave · Minor variance
To construct a rear addition and intrior alterations.
190 m away · filed Jan 11, 2024 · Approved
54 Westgate Blvd · Minor variance
Proposal to construct a new two storey dwelling with a front porch, side porch, rear deck, rear balcony and a detached one storey garage.
120 m away · filed Apr 6, 2023 · Approved
24 Southgate Ave · Minor variance
Proposal to construct the second floor addition over top and to the rear of the existing garage
180 m away · filed Jun 14, 2022 · Approved
23 Northmount Ave · Minor variance
Proposal to construct a 2 storey addition and covered patio at the rear of an existing single family detached dwelling.
240 m away · filed Nov 25, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.