Toronto address · Ward 1, Etobicoke North
172 Belfield Rd
The City of Toronto has 9 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Designated structure · Sign building permit related
The proposal contains two non-illuminated wall signs, both displaying static copy.Sign 1: 1.17m L x 4.14m W x 0.01m D at a height of 5.10m, erected at the first storey on the east elevation.Sign 2: 1.17m L x 2.60m W x 0.01m D at a height of 3.34m, erected at the first storey on the south elevation.**NUTRIAG**
Applied Feb 10, 2023 · issued May 5, 2023 · completed Jan 3, 2025 · Permit 23 112763 DST
- Revision issued
Addition or alteration · Multiple projects
REV 01: Reinforcement of existing structural members to accomodate the added loads from the added RTU/MUA on the roof. Reinfrocement includes welded rods to affect OWSJ. Interior alterations to convert exsiting space into a new warehouse with a rear office space addition.
Applied Dec 21, 2022 · issued Jan 20, 2023 · Permit 21 116604 BLD (revision 01)
- Closed
Plumbing
REVISION 2 - relocate emergency shower, add emergency eyewash station, and revise domestric hot and cold water to serve bio-reactorPlumbing - Interior alterations to convert exsiting space into a new warehouse with a rear office space addition.
Applied Jun 20, 2022 · issued Jul 21, 2022 · completed Jul 6, 2023 · Permit 21 116604 PLB (revision 02)
- Closed
Heating and ventilation
REv 01: ADD NEW HVAC DISTRIBUTION / VENTILATION TO THE LABORATORY AREA.HVAC - Interior alterations to convert exsiting space into a new warehouse with a rear office space addition.
Applied Apr 11, 2022 · issued Oct 19, 2022 · completed Jun 12, 2023 · Permit 21 116604 HVA (revision 01)
- Closed
Plumbing
Rev 01: revision to existing plumbing permit to add new underfloor plumbing to laboratory area.
Applied Mar 2, 2022 · issued Apr 4, 2022 · completed Jul 6, 2023 · Permit 21 116604 PLB (revision 01)
- Closed
Drains and site services · Inside and outside drains
Drain - Interior alterations to convert exsiting space into a new warehouse with a rear office space addition.
Applied Nov 10, 2021 · issued Dec 9, 2021 · completed Nov 10, 2023 · Permit 21 116604 STS
- Closed
Heating and ventilation
HVAC - Interior alterations to convert exsiting space into a new warehouse with a rear office space addition.
Applied Feb 16, 2021 · issued Sep 1, 2021 · completed Jun 12, 2023 · Permit 21 116604 HVA
- Inspections under way
Addition or alteration · Multiple projects
Interior alterations to convert exsiting space into a new warehouse with a rear office space addition.
Applied Feb 16, 2021 · issued Aug 6, 2021 · Permit 21 116604 BLD
- Closed
Plumbing
Plumbing - Interior alterations to convert exsiting space into a new warehouse with a rear office space addition.
Applied Feb 16, 2021 · issued Aug 6, 2021 · completed Jul 6, 2023 · Permit 21 116604 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
145 Belfield Rd · Minor variance
To permit a Vehicle Sales and Vehicle Rental establishment.
220 m away · filed May 29, 2025 · Approved
180 Belfield Rd · Minor variance
To construct a one-storey rear addition.
70 m away · filed May 25, 2018 · Approved
195 Belfield Rd · Minor variance
To construct a raised platform.
180 m away · filed Dec 8, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.