Toronto address · Ward 14, Toronto-Danforth
173 Arundel Ave
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - Construct underpinning and basement walkout
Applied Jun 26, 2020 · issued Jul 3, 2020 · completed Apr 15, 2026 · Permit 20 160592 PLB
- Closed
Small residential project · Multiple projects
Construct underpinning and basement walkout
Applied Jun 26, 2020 · issued Jul 3, 2020 · completed Apr 15, 2026 · Permit 20 160592 BLD
- Closed
Drains and site services
Drain - install backwater valve Construct underpinning and basement walkout
Applied Jun 26, 2020 · issued Jul 3, 2020 · completed Aug 9, 2022 · Permit 20 160592 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
995-1005 Broadview Avenue and 2-4 Mortimer Avenue
7 storeys · 50 homes · Mixed use
310 m away · Site plan · Approved · filed Dec 6, 2021
- Submitted
16 storeys · 332 homes · Mixed use
330 m away · Site plan · Submitted · filed Apr 2, 2026
- Under review
8-40 Gowan Avenue and 5-19 Cosburn Avenue
24 storeys · 424 homes · Residential
400 m away · Site plan · Under review · filed Apr 26, 2022
- Under review
25 storeys · 299 homes · Residential
490 m away · Site plan · Under review · filed Apr 26, 2022
Neighbours’ Committee of Adjustment files within 250 m
120 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey dormer addition with a rooftop deck.
130 m away · filed Jul 29, 2026 · Hearing scheduled
90 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front third storey dormer (the existing dormer will be demolished), a rear third storey addition, a rear three-storey addition with a rear basement walkout, and a rear ground floor deck with stairs.
190 m away · filed Jun 24, 2025 · Approved
80 Nealon Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, and a rear ground floor covered deck with a rear basement extension below.
80 m away · filed Aug 1, 2024 · Approved
141 Arundel Ave · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a rear one-storey addition (to replace the existing one-storey addition).
220 m away · filed Jul 11, 2024 · Approved
78 Westwood Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition. The existing rear one-storey addition will be demolished, and the existing shed in the rear yard will be maintained and unaltered.
170 m away · filed Jun 17, 2024 · Approved
94 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear terrace (above the second storey roof), a front second storey terrace (above the front porch), and a rear ground floor deck with stairs. The existing front porch and front second storey balcony will be reconstructed.
170 m away · filed Apr 3, 2024 · Approved
51 Nealon Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a front planter and a rear terrace.
110 m away · filed Apr 3, 2023 · Approved
92 Mortimer Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a second storey balcony above, a rear ground floor deck, and to enclose the existing covered porch.
70 m away · filed Mar 15, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.