Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 21, Scarborough Centre

173 Canlish Rd

The City of Toronto has 7 building permits since 2017 (6 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • New house · New building

    REVISION 2 - Partially revise second floor layout and remove foyer closetDemolish existing one storey dwelling & build two storey singe family dwelling with finished basement and integrated garage with below grade entrance in rear yard

    Applied Nov 3, 2025 · issued Dec 12, 2025 · Permit 24 149098 BLD (revision 02)

    Revision issued
  • Heating and ventilation

    REVISION - Partially revise second floor layout and remove foyer closetHVAC - Demolish existing one storey dwelling & build two storey singe family dwelling with finished basement and integrated garage with below grade entrance in rear yard

    Applied Sep 23, 2025 · completed Mar 26, 2026 · Permit 24 149098 HVA (revision 01)

    Cancelled
  • Plumbing

    Plumbing - Demolish existing one storey dwelling & build two storey singe family dwelling with finished basement and integrated garage with below grade entrance in rear yard

    Applied May 15, 2024 · issued Jul 9, 2024 · Permit 24 149098 PLB

    Inspections under way
  • New house · New building

    Demolish existing one storey dwelling & build two storey singe family dwelling with finished basement and integrated garage with below grade entrance in rear yard

    Applied May 15, 2024 · issued Jul 9, 2024 · 1 home added · Permit 24 149098 BLD

    Inspections under way
  • Demolition

    Demolition existing house

    Applied May 15, 2024 · 1 home removed · Permit 24 149139 DEM

    Under review
  • Drains and site services

    Drain - Demolish existing one storey dwelling & build two storey singe family dwelling with finished basement and integrated garage with below grade entrance in rear yard

    Applied May 15, 2024 · issued Jul 9, 2024 · Permit 24 149098 DRN

    Inspections under way
  • Heating and ventilation

    HVAC - Demolish existing one storey dwelling & build two storey singe family dwelling with finished basement and integrated garage with below grade entrance in rear yard

    Applied May 15, 2024 · issued Jul 9, 2024 · Permit 24 149098 HVA

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new dwelling.

    Decision: Approved (hearing Apr 4, 2023)

    Filed Jan 26, 2023 · File A0023/23SC

    Closed

What’s planned nearby

Development sites within 500 m

  • 1519 Birchmount Road

    8 storeys · 103 homes · Residential

    390 m away · Rezoning · Under review · filed Feb 9, 2022

    Under review
  • 1296 Kennedy Road

    11 storeys · 192 homes · Residential

    480 m away · Site plan · Under review · filed Jan 6, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 67 Ellendale Dr · Minor variance

    To construct a new front porch with canopy and an expansion of the existing garage.

    40 m away · filed Nov 27, 2018 · Approved

  • 171 Canlish Rd · Minor variance

    The applicant is seeking relief from the provisions of the Zoning By-law to construct a new one storey rear addition to the existing one storey single family dwelling.

    10 m away · filed Oct 18, 2017 · Approved

Everything planned in Scarborough Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.