Toronto address · Ward 20, Scarborough Southwest
175 Danforth Rd
The City of Toronto has 5 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct a second floor addition to existing detached garage and convert to a garden suite
Applied Jun 12, 2025 · issued Jun 20, 2025 · Permit 24 192424 HVA
- Inspections under way
Small residential project · New laneway / rear yard suite
Proposal to construct a second floor addition to existing detached garage and convert to a garden suite
Applied Aug 2, 2024 · issued Mar 5, 2025 · 1 home added · Permit 24 192424 BLD
- Inspections under way
Plumbing
Plumbing - Proposal to construct a second floor addition to existing detached garage and convert to a garden suite
Applied Aug 2, 2024 · issued Mar 5, 2025 · Permit 24 192424 PLB
- Inspections under way
Drains and site services
Drain - Proposal to construct a second floor addition to existing detached garage and convert to a garden suite
Applied Aug 2, 2024 · issued Mar 5, 2025 · Permit 24 192424 DRN
- Inspections under way
Small residential project · Addition(s)
Proposed one storey addition at rear of existing single family dwelling
Applied Feb 22, 2019 · issued May 21, 2019 · Permit 19 117948 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
594 Warden Ave · Minor variance
Proposed front and rear addition including interior alterations to existing dwelling. Demolition of front sunroom and rear addition. New house by way of renovation.
170 m away · filed Sep 2, 2026 · Accepted
56 Wolcott Ave · Consent
To obtain consent to sever the existing lot into two new residential lots. Cross reference Minor Variance applications A0054/25SC & A0055/25SC being considered jointly.
240 m away · filed Mar 10, 2025 · Application withdrawn
56 Wolcott Ave · Minor variance
To construct a new detached three-storey dwelling. Cross reference Consent and Minor Variance applications B0010/25SC & A0054/25SC being considered jointly.
240 m away · filed Mar 10, 2025 · Application withdrawn
56 Wolcott Ave · Minor variance
To construct a new detached three-storey dwelling. Cross reference Consent and Minor Variance applications B0010/25SC & A0055/25SC being considered jointly.
240 m away · filed Mar 10, 2025 · Application withdrawn
15 Butterworth Ave · Minor variance
To demolish existing dwelling and to construct a new single detached 2-storey dwelling. This application was previously deferred at the September 20th, 2023 hearing
240 m away · filed Jul 20, 2023 · Approved
37 Mystic Ave · Consent
To sever the property into two residential lots with both lots to be developed with a two storey, detached dwelling requiring variances to the Zoning By-laws. Cross-Reference Minor Variance Applications: A0087/23SC and A0088/23SC. NOTE: The consent application and the minor variance applications will be jointly considered by the Committee of Adjustment.
190 m away · filed Mar 24, 2023 · Approved
37 Mystic Ave · Minor variance
To permit the construction of a new, two-storey detached dwelling. Cross-Reference Consent application B0015/23SC and Minor Variance application A0087/23SC. NOTE: The consent application and the minor variance applications will be jointly considered by the Committee of Adjustment.
190 m away · filed Mar 24, 2023 · Approved
37 Mystic Ave · Minor variance
To permit the construction of a new, two-storey detached dwelling. Cross-Reference Consent application B0015/23SC and Minor Variance application A0088/23SC. NOTE: The consent application and the minor variance applications will be jointly considered by the Committee of Adjustment.
190 m away · filed Mar 24, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.